Laserfiche WebLink
Mas pee Conservation Commission Page Seven <br /> Meeting o August 16 1984 <br /> motion was made by <br /> . March I ardano, seconded by PaUline DeLory and <br /> then noted "in favor of" unanimously. <br /> Joseph Benoit -r SSC Cape Cod surrey Consultants , agent <br /> Peggy Collins , representative <br /> Application for renovation and construction of full basement. <br /> Lot #1189A. Cottage Unit #25, Maushop Village <br /> Ms . Collins presented plans regarding this project and stated, "The <br /> application before you entail.s the li-ting up and blocking in place <br /> of the cottage to instal.l a. full cellar wile it is lifted up and <br /> blocked in place . The cottage will not be relocated even temporarily. <br /> Plans have been submitted showing the wall outline as well as the <br /> wall shape and structural aspects 4 Grading associated is minimal <br /> as grading at Daus op Village in this particular area has already been <br /> done . Any grading necessary to be done will be performed manually. <br /> I'l e filed, because the location is in the buffer zone which is regulat- <br /> able becattaopotential a ` ecta.tion of the resource area, in this <br /> case , the coastal bank. The distance to the coastal bad is 88' to <br /> 98' from where the work area will be , most of the building falls <br /> outside , eviel-n of 'u-eh buffer zone . <br /> Ms Dardano , addr ss .n IJ'Ir.. Benoit, a.s� d, ��earlier at a, previous <br /> hearing) ,, rou had an, objection t cotta.-r-e relocation. Have you <br /> %-d t h d r ;fir la �.t b j ' " I r1r. Benoit t <br /> ohairman, that the <br /> -' Ln <br /> :� "# ::� Ia.:_-L" C, .?'! ?� � %_- _ ter..- 1.1 U h .: . <br /> su mit ted with the i il�ng an <br /> filing inito. led it ac rdin �. <br /> � y <br /> Since there were no further questions , comments or discussion, the <br /> Chairman stated that the matter would be taken under advisement . <br /> `'t i iiia Cumin,,-,T - G orge en a.�, fir.. , agent <br /> Application to repair and maintain pier, replace all decking and <br /> any pilings Found to be unsafe . No work to be done to repay.r marine <br /> railway at this time . Pro of located at Simons Narrows Road, <br /> Mitchell' s Landings <br /> The C air m noted that no DEE filing number has yet been assigned <br /> _to the project. <br /> 1r. Denviay sue r tted a list of the abutters , return receipts o- <br />