My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/8/1984 CONSERVATION COMMISSION Minutes
>
11/8/1984 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2018 11:28:07 AM
Creation date
2/10/2018 11:27:20 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/08/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
., <br /> Mashpe e Conservation Comnission <br /> Meeting of November 8, 1984 <br /> Page Six <br /> Ir. Clark said that the deck will abut the 111 contour. He has <br /> recommended that a row of staked hay bales be placed at that point . <br /> Mr. Clark said that the proposed septic system does conform to the <br /> requirements of Title V. Further, theme will be a l00% reserve <br /> leaching area installed <br /> Mr. Clark said there will be no changes in the grades from the found- <br /> ation to the water.. <br /> Mrs . Thomas expressed concern about the proximity of the foundation to <br /> the ACC area, Mr. Clark expressed some agreement. In answer to the <br /> question of deck construction, he was of the opinion that it was to be <br /> constructed of sonotubi'ng. The deck is approximately 1 1 wide . Mr. <br /> Clark said that it would not be cantilevered. <br /> Mrs . Studley called for further questions , comments or discussion. As <br /> none was forthcoming, she said that the matter would be taken under <br /> advisement. <br /> Wm. M. Kolb .Corp. <br /> This application is to repair and maintain an existing stone mound, <br /> install additional polyfilt r and crushed stone and revegetate ex- <br /> posed <br /> -posed areas at #529 Triton Way, New S e bury. <br /> Mrs . William Kolb appeared before the Board to present information <br /> 1 <br /> regarding the proposed project . She stated that the existing sea. <br /> wall was put up approximately eight years ago and is very much in <br /> meed of repair. The property is located next to laushop Village . <br /> Access to the project site would be by right-of*-way along side of the <br /> property which does go right to the beach. <br /> There is a prior Order of Conditions which was to construct but not t <br /> maintain <br /> There was no Certif icate of Compliance issued at the time of completion <br /> of the prior filing project for construction. Mrs , De cry said that <br /> a Certificate' of Compliance was not a requirement at that time . <br /> It was agreed by members of the Commission present that the information <br /> being presented was incomplete and inadequate . Mrs . Kolb wasin- <br /> structed to gather the appropriate informations wake the proper filing <br /> with DEQE which filing has not been done and the hearing will be cont- <br /> inued at the meeting scheduled to be held on November 29, 1984, <br /> Chairman Studley loft the meeting at 9:00 P, M, Vice Chairman Marc <br /> rao chaired the meeting from that time until conclusion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.