My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1985 CONSERVATION COMMISSION Minutes
>
1/24/1985 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:03:12 PM
Creation date
2/16/2018 2:12:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/24/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> • <br /> A <br /> Aashpee Conservation Commission <br /> Res Cotu t Bay Condominium Trust SE 3,,361 <br /> (cont . ) <br /> SUPERSEDING ORDER OF CONDITIONS <br /> 7. Install railroad tie wall at steep slope similar to <br /> Building P. Install cotoneaster• behind wall at four- <br /> foot spacingo Mulch planted areas with three inches of <br /> pine bark. <br /> 8. Redesign and relocate cluster as shown on plan dated 9/17/84. <br /> Behove excessive fill as necessary to achieve no greater than <br /> 2:I slope , removing all sand fill from the base of existing <br /> oaks and <br /> • Loam " and seed or hydr'os , Mulch <br /> area with ha' if soil tackif er is not used when hydroseeding. <br /> M <br /> 9. Grade leve, lateus to drain. Install dunerass clumps at <br /> 18"oc direct Y in sand. <br /> 10 . Reposition lot line so proposed building can be relocated <br /> approximately 20 feet farther back from top of slope . Remove <br /> excessive Fill from slope to achieve no greaten than 2 :1 slope . <br /> Loam 21 and seed (or hydros e ed . gulch area with ahy if <br /> soil ta.ckifier is not used when hydroseeding. Install F ugosa. <br /> roses 2 gad. . in a double-staggered row at three foot spacing <br /> at top of slope to discourage trespassing on sloped <br /> 11, Install Ftone trench at outer edge of crushed stone paving. <br /> Grave slope between outer edge of stone and existing vegetation. <br /> Loamy 2' and seed or I ydroseed with conservation seed mix . <br /> Mulch area with hay if soil tac lfler is not used. Install <br /> suzn ensweet clethera in double-staggered row on face of slope <br /> at four-Foot spacing. <br /> 12 , All work shall be -perfor red in accordance with site plans and <br /> revi,ced plans submitted and approved by the Mashpea Conservation <br /> Commi.csion. <br /> 13. The office of the Mashpee Building Inspector shall be notified <br /> at least twenty-.,four hours In advance of commencement of work. <br /> 14 . A copy of this Superseding Order of Conditions shall be made <br /> available at the construction sites . It is the responsibility <br /> • of the applicant to ensure that all contractors are aware of <br /> all of the orders of conditions for this project* <br />
The URL can be used to link to this page
Your browser does not support the video tag.