My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1985 CONSERVATION COMMISSION Minutes
>
1/24/1985 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:03:12 PM
Creation date
2/16/2018 2:12:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/24/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y AP E E. ORDER OF CONDITIONS ARTICLE i CONSERVATION --TAWS <br /> PAGE <br /> Plan <br /> Title Dated Sfgn d and Stamped by: a with- <br /> Plans <br /> hp C oris rvat .ori <br /> submitted by <br /> dans9/17/84 <br /> M � Allan.-.W . Abnnhnmson. QQmmission <br /> z�ne submitted by Ron Schmidt lashpee Conservation <br /> Revised plan 11/30/84 Commission <br /> submitted with <br /> building app . <br /> k <br /> SpecW Conditions(Use additional paper if nee any) uperseding order of the <br /> iashpee Conservation Commissions <br /> 1 , That area of salt marsh below the '6-foot contour shown as <br /> area #1 on the above-referenced plan, that has been directly <br /> or indirectly buried by fill,, must be returned to its natural <br /> condition by remove.ng the fill by hand and replant :ng with <br /> S part iia patens if necessary. <br /> 2 , r No buildings shall be constructed any closer than 6 feet from <br /> the 20-foot contour, This will, require a realignment of <br /> Building #11 . <br /> 3 , ay ."bales shall be placed and maintained between the construction <br /> f Buildings l-1 , #6 and the wetlands . This hay bale barrier <br /> shall be maintained until construction is completed w-& a Certi_ . <br /> ficate of Compliance - is obtained , k <br /> The Mashpee Conservation Commission must be notified of any <br /> changed irr the plans before such changes are implemented . <br /> 5 . All exposed areas shall be mulched immediately and vegetated <br /> as soon as exterior construction is complete. <br /> 6 . All construction debris shall be removed from any wetland area <br /> and coastal bank. The removal shall be from the upland portion <br /> of the project . <br /> ■+ ##■f#■s#■iiia•ss##+s*• + #•**■is� ■■sss■+i.rr**■s+■rte•■i as ss+s+++#frtstsfrrt•r#siii ■i..■.......r■w#.iM++■ ++#Mr##i■i+M##M+#♦i#####+#*##■;##**•+tsM+#i##`i;*###■i MoaMf•#■•*++• <br /> • t <br /> {Leave Ste#Mw*4 <br /> 6 1 <br /> V. <br /> - "SPecialConditions 'are cont. <br />
The URL can be used to link to this page
Your browser does not support the video tag.