My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/9/1985 CONSERVATION COMMISSION Minutes
>
5/9/1985 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:10:37 PM
Creation date
2/16/2018 2:23:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/09/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l as epee Conservation Commission <br /> Meeting of May 9, 1985 <br /> Page Fire <br /> „ <br /> Joseph C . Sao (Holmes & McGrath, Inc. -- agent) <br /> John Landers-Ca ley, representative for the agent presented plans , <br /> This application is a Request for Determination of Applicability to <br /> construct and maintain a, single-family dwelling; to install necessary <br /> utilities and sewage--disposal system and to perform associated grading, <br /> l o a ing and seeding wilhin flood zones A--11 (el. 11) , B and C at <br /> Lot #136 w ipporwill Circle . <br /> Mr. Landers-Cauley stated that only a small portion of a little corner <br /> of the house is in the flood zone . The sewage-disposal s ste will be <br /> in the flood plain, <br /> After brief discussion, a negative determination was made, .. <br /> Jack Cramer All Cape Survey Consultants - agent <br /> This application is to construct and maintain a wooden deck and two <br /> floats in and over the tidewaters of Great Kiger at Lot #6l Keel way, <br /> Little Neck Bad`, New Seabury, <br /> Chris Costa, agent, presented plans , The dock will extend from paean <br /> high water 45' . Ten pilings are proposed , The floats will be con- <br /> structed off--site and floated to the site , doles for the piles on the <br /> land side will be hand dug. There will be no cutting on the slope . <br /> Floats will not be stored on the upland shores . <br /> After discussion, as there were no further comments , questions or <br /> discussion, Ms . Dardano closed the hearing and stated that the matter <br /> will be taken under advisement. <br /> Edward Kazarian (All Cape Surrey Consultants - agent <br /> This application is to construct and maintain a wooden dock & float <br /> over the waters of Je u Pond at Lot #28 Water line Drive North. <br /> Dock will not exceed ' from M. L. We <br /> Chris Costa., agent, withdrew this application at this time , <br /> k <br /> Marvin Glick (All Cape Survey Consultants - Agent) <br /> This application is to construct and maintain a wooden dock and two <br />
The URL can be used to link to this page
Your browser does not support the video tag.