My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/3/1987 CONSERVATION COMMISSION Minutes
>
9/3/1987 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:13:04 PM
Creation date
2/16/2018 3:05:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/03/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee conservation Commission <br /> Meet ng o eptember 3 , .1 987 <br /> Page 9. <br /> Mr. Rosenberg stated the mE .sn condition allow the <br /> building o a house-'a street a -road. <br /> Mr. Leak questioned- the bounds and stated he Was unsure 75A reached <br /> the bounds. They do 'not show There the ditch was that was filled in. <br /> He advised it Was his impression from Mr. Makepeace when he bought <br /> the land that the property line Went to the center of that ditch <br /> down to the pond and is currently having this surveyed as he be- <br /> lieves his property is being violated by 25 feet at the pond edge, <br /> When he is satisfied this is trues he will take the necessary action. <br /> He wanted to put then on r o is a o this question. <br /> Nis Baylog suggested an opinion from Town Counsel be requested and <br /> was told by Ms Behrman this would ]not be necessary as this is <br /> publicly travelled way. <br /> Mr. Burns asked if the road goes into Mr. Leak's property only and <br /> was advised it is a through road and is con nonly used by fishermen. <br /> Ms Rayiog requested the hearing to be continued indefinitely. <br /> 75A SHIELDS ROAD - CONTINUED INDEFINITELY. <br /> 74A SHIELDS ROAD; Nis Baylog stated haybales will be staked prior <br /> to any vegetation clearing, Roof drains to be recharged, The <br /> dwelling is 71 feet from the edge 'of the wetland, the septic is <br /> 121 feet. There is a 25 foot vegetated buffer. <br /> Ms Behrman questioned contour changes. Nis Baylog stated they are <br /> making a cut but not pushing fill into the drainage easement and <br /> it would probably have to be removed off site, Ms Behrman asked <br /> the elevation of the drainage easement and Nis Baylog stated the <br /> ground elevation is 54.0. <br /> John stated the setback is 45 feet off the road, Be would like to <br /> see the work limit roved forward and the buffer zone. <br /> Ms Baylog advised they are trying to maintain a contiguous limit <br /> of work. She agreed the buffer could be increased by 10 feet <br /> which she felt would be all the applicant would allow,, <br /> John advised if the old cranberry bog was reactivated the state <br /> Dept, of Agriculture states no development within 150 feet, <br /> M . Rosenberg stated if moved 25 feet there still would be 21 feet <br /> from the house, He recommended hay'bales no further than 20 feet <br /> from the house and no clearing, This would provide 51 feet of <br /> natural growth. <br /> Ms Baylog stated she cannot agree to this change. Mr. Rosenberg <br /> asked if the edge of the wetland is the edge of the cranberry bog <br /> and Ms Baylog stated it is the edge of vegetation, <br /> Ms Behrman stated this can be conditioned* <br /> Mr. Lenk advised this Was disapproved inn 1973 the lot sizes are <br />
The URL can be used to link to this page
Your browser does not support the video tag.