My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/1987 CONSERVATION COMMISSION Minutes
>
11/17/1987 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:05:02 PM
Creation date
2/16/2018 3:08:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> November 17, 1987 <br /> Page 11 , <br /> SARAKUM T: The consultants recommended that a series of witnessed <br /> core samples be taken in the area of filling as their results indicate <br /> there is potential the two -wetlands indicated on the plan were <br /> connected before the filling was done without permits from the <br /> Commission . If illegally filled, this changes everything on the file. <br /> The previous enforcement order will be checked_ to see if the trailer <br /> removal was ordered . <br /> ENFORCEMENT ORDER <br /> Starting 80 feet from the line between the two electrical boxes <br /> every 40 feet along the center of Pare Place for a distance of 240 <br /> feet from the' 0 foot starting place, cores should be taken from <br /> depth of 6 feet. <br /> - t <br /> Cores also to be taken on Lots 27 and 26 "graded fill , 5 feet in from <br /> the edge of the delineated wetlAnd as delineated by Arline Wilson <br /> every 40 feet, 8 foot deep cores. All cores must be witnessed. <br /> ENFORCEMENT ORDER <br /> The applicant shall be required to conduct a survey and submit a <br /> comparison of the wetland delineation by Sabatia and Arline Wilson . <br /> VOTE: lotion made and seconded to issue two - enforcement orders t <br /> Bradgate Assoc. for Sarakumi t Village. <br /> DANIEL H ST TT F , WILLOW BEND. Enforcement order. Photos of the <br /> retaining wall were reviewed . The Buildin8 Inspector and Planning <br /> Board do not have plans of the wall . It was claimed this was done to <br /> sage the pine trees which Lisa pointed to with the roots exposed. Lisa <br /> advised she will be aeetin8 with Mr. Hostetter tomorrow to walk the <br /> site . She stated she would like to request an aerial photo of the <br /> site. The Commission felt this was expensive and not necessary. It was <br /> agreed a certified as built plan of the entire project to date should <br /> be submitted . Upon receipt , comparison will be made for discrepancies <br /> on the application. <br /> A re egetation plans for the cleared slope i to be filed. A siltation <br /> barrier is to be placed at the base of emplaced fill on the tee. A <br /> s i l tat i on barrier 3 feet downhill from the illegally installed <br /> retaining gall and continuin8 10 feet on either side beyond the extent <br /> f the road cuts on the uphill side of the road . Two enforcement <br /> orders were issued and sifined . <br /> VOTE: Motion made and seconded to issue two enforcement orders to <br /> Daniel Hostetter . <br /> EMERGENCY ORDER OF CONDITIONS FOR ASH RS PATH WATER MAINS. It was <br /> noted Ms Beh man could sign if ratified by the Commission. <br /> Ha bales to be installed on both sides of the road at the edge of the <br /> gorge. On both sides of the road there shall be ha bales extending <br />
The URL can be used to link to this page
Your browser does not support the video tag.