My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1988 CONSERVATION COMMISSION Minutes
>
1/28/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:03:17 PM
Creation date
2/16/2018 3:12:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/28/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission ' <br /> January 2 , 1988 <br /> Page 5. ti <br /> Lisa ted' he also suggested the brick patio be set in sand - and b <br /> marked . off specifically so no trees are taken down along the ed e.. .+ <br /> . Coffey stated for stability on the slope, the primer of tire' ' <br /> 4 <br /> p tio,`TI -e defined to halt migration of the' bricks. Water flowIng "acr.oss <br /> _ the s n �P:set` co•ul d take i t with it. He suggested 2 X 6' s 'or 2 X 81s, + <br /> on edge, I' -above the sand as a buffer' to keep things from sigratin . <br /> MS Behrmn stated this point should be considered for the path also, <br /> a terraced effect. <br /> Mr. Paleentier a reed to visit the site with the Conservation agent. <br /> ;. <br /> He stated if 1" spacing was required, they would be agreeable. 1t was <br /> - <br /> stated .2 X 6' s were specified as preferable for decking,. <br /> HEARINC CONTINUED TO FEBRUARY 25, 1988 AT : 00 P.M. ap <br /> = 5 - Willis Michaelson (Arrow Engineering) Continued from January 21 <br /> New pleas were presented. The Board of .Appeals decision has not been '. <br /> -received*Abutters receipts were presented by George Thorn represen i•ng +. <br /> the applicant. <br /> Ms Behrman stated the Commission wi+l l j•a l 1 ow a presentation but no dec- <br /> ision wi11 be issued. - <br /> . Thorn• stated the proposal is for a docking facility.' The lot is <br /> vacant and vegetated-with no intention of any house - being buii't, An <br /> existing path has been followed with a '4" gravel walkway- to the be- <br /> ginning of the dock. The pier extends out o• a 12 X 4 ramp which <br /> settles onto two a 10 f •. floats at the - end o the dock. Mean High. <br /> , ` <br /> Water and'' Mean Lora- Water is shown on� the plans.` burin an onsite with <br /> Lisa, the edge: of the salt marsh was marked. Proposed spacing on the <br /> decking is 1" . Total length is 85 feet# A variance will be requested <br /> next wek. lf the 70 ft. start - the edge of the marsh -this would 'be <br /> all night; i•f no.t, and it is necessary o cut the size down, it would + <br /> = be possible to do so. <br /> Lisa advised Town Couns t has been consulted. Ms Behrman stated if <br /> this is before Town Counsel , it is not proper for the Commission to <br /> comment* She questioned the house the facility is -to serve. t was <br /> stated there would be none. She stated q uest.i ox +teas raised at a prior <br /> hearins for a dock witli no house and Town Counsel should be asked for - _ <br /> an opinion. <br /> Mrs. Ferriday explained the legal language used was that, piers arae a _ <br /> secondary use and there must be a primary use before a secondary - use. <br /> CONTINUED PENDING BC P APPEALS ACTION AND OPINIONOF TOWN COUNSEL <br /> TO MARCH 1 , 1988 at 7: 30 P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.