Laserfiche WebLink
Conservation Commi-ssion <br /> . February. 25, 1988 <br /> Page 6. <br /> Mr. Ho it and stated he was only saying to do it properly he does not <br /> Mink the vegetative cover is there and can control erosion nor can <br /> you just put cover on the site to control erosion. Ms Behriman stated <br /> she failed to see evidence, in the course of an on-site, of erosion <br /> occurring on the site. There is a small amount around the edge of the <br /> bank which is normal around any lake. Mr . Howland disagreed . <br /> Mrs. Ferriday asked why it is necessary to fill behind. Mr. Howland <br /> advised it is not fill but 50 yards of loam will be brought in. With <br /> constructio ,of the wall , there will be irregularities in the ground <br /> and the loam is for a smoothing effect. It goes from zero to 6 inches. <br /> Mrs . Jacobson stated that is a lot of lampa and then to be regrassd <br /> Mr . Howland stated, as it is now. In the Notice of Intent they <br /> recommended that a vegetat'iv'e cover of no Brass be put in for at least <br /> 15 feet; wetland species would do better than grass. <br /> 5 <br /> HEARING CLOSED. ORDER OF CONDITIONS WITHIN 21 DAYS. <br /> - Thomas E. Cimeno Jr. , 29 Frog Fond Close. Continued from <br /> 2/4/88, A n existing bulkhead on the site has been damaged by the <br /> actions of an abutter and has to be repaired before the gangway can be <br /> hung off of i t. The gangway goes to two 16' tethered floating docks at <br /> . 90 degrees , one to the other . Permit has been recie ed from the Harbor <br /> master for the - floating dock , and Zoning Board of Appeals has approved <br /> construction . <br /> Mrs. Ferriday advised Lisa has checked and pilinas are in good shape. <br /> Mr. For iati stated the original permit for the bulkhead allows then <br /> to repair it in kind. <br /> Ms Behrman stated this would have to be taken up with the abutter and <br /> if repair of the bulkhead is wished, this will have to be amodific- <br /> ation in the Notice of Intent. At this hearin8, specifically being <br /> discussed are the steps, ramp, hinging on the e i sting pilings and <br /> dock . <br /> Mr. Coffey asked, from the top of the hill , is the proposed staircase <br /> in the existing alleyway down the hill . Mr. Foriati stated generally, <br /> yes. Mr. Coffey continued, elevation of the ground section shows con- <br /> crete columns and he would6e comfowtable with those hand dug rather <br /> than to try to access all that concrete to the site . Mr. Fo i at i <br /> stated all holes will be hand dug. The 'concrete will be a hand batched <br /> process and carried to each hole. <br /> Mr . Coffey stated unless the is a mechanical 4'astener rom the sono tube <br /> to whatever structs, they wi l l' f l oat way . Mr . For i at i stated the <br /> ent a staiway to the bulkhead is above High Water . Mr. Coffey stated <br /> with a storm, that would wash if only sitting atop concrete pilings, <br /> Mr. Fo i at i stated it will be s i tt in on metal brackAs with bolts down <br /> into concrete. This can be put in the Order of Conditions. <br />