Laserfiche WebLink
Conservation Commission <br /> Februrr 25 , 1988 <br /> Page 7. <br /> Mr. Coffer askd how the pilingsare being tied together so , the ramp can <br /> be hinged off of them. Mr. Foiati stated , unless in th same manner a <br /> shown om the original perm it t, repairs in kind, he wou l d have to get <br /> permit for alteration. <br /> 1r. Coffey stated it is his feeling, to be structurally sound, the <br /> should be tied together with a strongback , whether that section should <br /> be replaced with vertica'I tongue and groove as items is a separate <br /> issue. A single or double strongba k would do the duty. He asW wFA is <br /> proposed for the sire with the vertical tongue and groove. Mr. Fo i ati <br /> stated nothing is planned except for repair in kind. He further <br /> advised in h i s correspondence to 'Ir. Cimeno that the gangway cannot be . <br /> hinged to the bulkhead until it is repaired. <br /> Mr. Burns stated there is nothing to support the bulkhead on the land <br /> side in this area. Mr. Faziati Mated he would hope the excess fill <br /> material hand dugout oulde put behind the bulkhead where washed <br /> out . <br /> Ms Behrman stated if they are planning to do this, it should be noted <br /> in the Notice of latent. <br /> Mrs . Ferriday suggested the Order of Conditions be issued on this app- <br /> lication and if there are any changes then the order can be amended <br /> Mr. Coffey asked if there was any structural reason for having risers <br /> on the staircase and was told there will be no kicboard , only the <br /> tread. <br /> Re the concrete, Mr. Coffey asked if it will be water borne or walked <br /> down the completed staircase. Mr. For iati stated it is proposed to <br /> mix it at the top of the slope and hand carry it Mown, two 5 gallon <br /> buckets at a time, <br /> Ms Bhrman stated a reasonable work limit for the stairs will be 1-1/2 <br /> feet on both sides of the 4 foot stair with no disturbance beyond. Mr. <br /> For iati stated they will restore any disturbance within the work <br /> limit* <br /> [fir. Coffer asked if it is feasible to stipulate the stair running down <br /> the bank be built first before -construction proceeds in order that the <br /> bank will not be destabilized. Mr. For i s i agreed . <br /> Mrs. Jacobson questioned the off season storage. Mr. For inti agreed <br /> they will be stored on top of the existing structure or removed from <br /> the site. <br /> 1s Behrman suggested that it be conditioned to be anchored with mush- <br /> rooms to avoid having pieces of dock floating away. Mr. For iati <br /> stated the dock manufacturer will be consulted and Ms Behrman stated <br /> this should be submitted for approval . <br /> HEARING CLOSED. Order of conditions within 21 dans. <br />