Laserfiche WebLink
Y <br /> tASHP E CONSERVATION COMMISSION <br /> MEETING OF APRIL 21 , 1988 <br /> CommissionersPresent: V, Louise Beh rman, Gertrude Ferriday, carol Jacobson, <br /> Joseph Burrs, Mary Marsters, Patrick Coffey. <br /> Lisa Hanscom, conservation Agent, was present also. <br /> 7 :00 - Informal Discussion - Quashnet Woods - Forward Development. Alex Ditami <br /> presenting* The project consists of 580 units on the easterly side of the <br /> Quashnet River on the westerly side of route 28. There is a buffer strip of <br />' 00 feet from any wetlands to the areas to be developed which will remain <br /> completely intact with no construction, with the possible exception of some <br /> drainage basins, iso feet away from the closest wetlands. <br /> It is expected that the Town will be erecting a municipal well site on the <br /> portion of the property on the west bank of the river. I n order to feed the <br /> development, as well as to repay the Town OF Falmouth for the water Naas tepee <br /> has been receiving. It will be necessary to breach some of the wetland and <br /> the Quashnet Kiger, as well giving an easement over the property. Tori <br /> Fudala has been working on the project and the enact point of the crossing <br /> has not ,yet been determined. <br /> They have potential agreements with the state whereby the state may be getting <br /> the property. They have an agreement with the Town that, render any circum- <br /> stances, <br /> ircum- <br /> stance , e will make sure the town has the water site. They may be the <br /> entity to build it for the town and turn it over as a turn-key operation. <br /> Ms Behrman stated it was indicated there will be no construction in the buffer. <br /> zone, and asked if there will be a request for clearing. <br /> 1r. Ditarpi stated there will be no vista clearing, only for the pipes, A small <br /> section of berry may have to be constructed to control the outlet elevations i n <br /> some of the naturallyoccurring d pr� ssion . There is no i <br /> ntent to provide <br /> clear views of the Quashnet River. <br /> Concerning the drainage, Ms Behrman stated the Board would want ,to reserve the <br /> right to content on that when there are more plans in hand. She further stated <br /> the Board would be looking at how much is being channelled and to when, as far <br /> as subwatersheds are concerned. <br /> The Engineer stated an appropriate package will be submitted summarizing ing this. <br /> Ms B h rman stated the - maintenance nan - <br /> . Board would endorse a � to c program for any pro- <br /> posed <br /> posed gas traps. She further asked if, in planning to cross the River, they <br /> C had made any attempt to reach out to the membership of Trout Unlimited. She <br /> suggested they speak with them. <br /> Mr. Ditami stated the Dept. of Fisheries and Wildlife owns on either side of <br /> the river. Permission has to be from them, no matter who owns the well site, <br /> to get the water over to the other side. If no current easement exists, the <br /> crossing point will have to be identified and thea the legislature ou I d have <br /> to approve a eq nest by tete Tern of Mashpee to obtain an easement across that <br /> river. Trout Unlimited i s aware they want to cross the river for the water, <br /> If it is across the bridge,, it can be done overland. If across one of the <br /> old dikes, it can be done overland., <br /> r <br />