Laserfiche WebLink
Conservation Commission <br /> Meeting of ' May 19, 1988 <br /> Page 4. <br /> Days own a double parcel , 35, 750 s . ft. Due to existing ospoos and <br /> wells adjacent and Title V, placement was limited. <br /> Mrs. 'Fer-r i dayr stated the deck i not staked house i r. San ick <br /> ill check . He stated he will brin8 the work limit back 10 feet off <br /> the deck. r No clearing is proposed and it will be left in 'the natural <br /> state. <br /> i <br /> Mrs. Ferriday pointed out where trees should not be removed and the <br /> work limit placed accordingly <br /> Mrs. Jacobson stated Douse corner to house corner is shown as 24 , feet <br /> and 12 foot deck, if it goes 'any further forrrd the Commission is to <br /> be notified . <br /> CONTINUED PENDING RECEIPT OF PL ` ITH REVISED WORK LIMIT AND PROVID`ffl- <br /> ING THE STRUCTURE WITH DECK IS GOING 'TOBE NO CLOSER TO THE EDGE OF <br /> THE BANK THAN THE EXISTING STAKES. OTHERWISE - CONTINUED TO JUNE 1631 <br /> IF NECESSARY. <br /> 8: 15 Harold Jay Cohen lelito E vironmental Consultants? for the <br /> construction of an elevated walkway.9 70 feet -dongf to gain ace-e-ss to <br /> beach at -Lot 524 Triton Way.# Continued` from April 21 .. An amendment to <br /> letter sent 5/13/88 was presented together with abutters receipts. <br /> Kuri-sedplans were reviewed. 'The letter- was read listing revisions, <br /> Ms Behrm-An questioned the dr wel'I which was located on the plans by <br /> Jonathan Burt i . <br /> Mrs. Jacobson suggested 'they go` back 6 feet -with the bark gulch lie. - <br /> Thi Yvan- be written into an Order bf Conditions-. <br /> CONTINUED PENDING PLAN WITH ANOHER -FEET Off' THE WALKWAY. HE I C T <br /> E CLOSED UPON RECEIPT OF PLAN. <br /> 8: - R & H Realty Trust (Cape Islands Surveying) to construct ct <br /> single family residence and sewage disposal system at Lot 56 Water lix e <br /> Drive South. John Slavinskyr presenting. -Board of Appeals approval was <br /> received for a 50 foot variance in the' ACEC and 40 foot setback from <br /> the street line. Some of the decks' have been out out. r r el Is are <br /> prop s- d for roof runoff. Driveway will be of pervious sate-rials <br /> 1 . <br /> Hs Behrman asked what was proposed between the house and pool . _ <br /> Richard` Durbin, Tr. , advised they propose to have a pervious covering; <br /> bark mulch. A landscape plan was reviewed. It was noted this was <br /> drawn before revision in the plan. <br /> Mrs. Ferriday asked if permission- was necessar ► to put the fence in <br /> the easement, Mr. SIavinsky stated it is a drainage easement. <br /> Mr. Dubin stated it is also a war to the water, 'a reserved way. <br />