My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/28/1988 CONSERVATION COMMISSION Minutes
>
7/28/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:10:33 PM
Creation date
2/21/2018 12:35:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/28/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> July , 1988 <br /> Page 3. <br /> Ms. Be rman stated the Commission asked for a plan, not just the pho ow <br /> stats of the area of the base. A Prague verbal description of the area <br /> in the park which is town property was given. <br /> r--.-:_-,Murray stated, you. would,, need a plan as well as a.. meets. and. bounds <br /> t-ge description. The Commission agreed. <br /> Ms Behrman. stated the Commission had asked. for- some type of coni-to-ring <br /> . program; what- water quality in f rm-at i on they had. <br /> Col . Br gna stated the water quality discussed in January , What was <br /> offered- i-n the July Ist correspondence and what is proposed here '-for-. <br /> the rest of the calendar- year -will address each of the 3 or -4 separate <br /> r i butarg areas along w1ith the present information that we have for <br /> the main distribution 1 ine down to- the pond and add all this inform- <br /> i onp o provide you with thebulk o the.. in foaati on that you are <br /> trgs to ascertain. Whether are h.ae one o . four areas, running. into <br /> st., it -is all going to flog down the same aairktrunk line. ghe ewe. <br /> have -the monitoring well 515. teat E,C, Jordan installed, last year with <br /> .t.he. fiveL separate ,.rounds of -sampling between. April -of 987. . r. 1 <br /> ,Rosenberg:-But we haven' t. seen any -of it. It.' s in here, -air~. .. <br /> Ms Behrman asked i f the lopnitoring well was- 50 feet deep. - Col V.I Brogna <br /> stated'. it.. -.is- a five well cluster._-., s Be .raan. .stat .d .that-. does not: <br /> adAres . the surface ground, we. speelific-ally.. asked for sur face- .runo f f.- <br /> -Co]. <br /> Bro na stated. -t-he information.ln-- the -.Ju.ly-.1---carr spondee . is the <br /> cne::.-:.and: or ly -s-et -of . results-.d'one two- .gears- ago.. We gave you. the, <br /> results. hese.. in-.-- the"_p ckage. ,E e- thJLng -was.--clean andr- they wiII- be- <br /> :--re sagP <br /> lin -4 days...from now for .the Jul g-#august amp l i ng period and <br /> 4--V-'.-.takes---1---4 weeks. for results <br /> He- -advised. the -samples were taken: to the right of- the. road situation <br /> upstream. from the oil-water separator* <br /> Mr-. . Rosenberg stated- upstream does not he-1p; it is needed on the other <br /> i 's.ide of. the separator.. <br /> i <br /> Col . , Br o na- stated if - it comes - out -with a.. non-detect there and. e erg- <br /> tKir - else is down gradient from. it, everything in here: has to stay. <br /> dean. - There. are no other tributary. areas, .this . is all airfie-Id, <br /> Ms Be roan asked what is coming out of the separator. From. all the <br /> descriltions we have had in the past,, the separator is6 contributing to <br /> the <br /> unaff and we have been told itys going to be replaced by a much <br /> arger one, more adequate aduate for what's going on. - -It is unknown.- when -the <br /> . � <br /> replacement willtake place and concern. is for what i coming out <br /> the s parato.r now, that's, what is going into the pond <br /> Col. Brogna state : g <br /> d he isnot o-ing. to . st and. corrected. on i , but maybe <br /> h : ai dr- the wrong thing. . He did not think it prudent for anyone to <br /> sag the sampling is at or above the separator. Normally.: at least the <br /> sag 1 in the are doin now, is at or, downgradient from the surface <br /> P g g g <br /> effluent o f the separator. That i s being done with the new contract <br /> Ms Behreana4 uested a plan reflecting past, current and future <br /> sampling sites to clarify the situation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.