My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/25/1988 CONSERVATION COMMISSION Minutes
>
8/25/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:10:23 PM
Creation date
2/21/2018 12:36:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/25/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> PUps1. 259 , 1988 <br /> Page 9. <br /> _ # Kirrane stated , while his client is willing to contribute to the <br /> cost of that, they do n-ot feel they are solely r spons.ib I e four all the. <br /> siltation that exists in the Mshpee Kiger` and. are 'certainly not ,pre- <br /> pared for the entire expense to do that, particularly in light it <br /> would be a significant expense in performing this engineering. <br /> Ms Behrman suggested he discuss this further with Mir. Virgilio and get <br /> back to the Commission. <br /> Lisa suggested the work be included in th-e Not i e ' f Intent, with' the <br /> money. <br /> -Mr. I irrane stated he would be happy to include what money they would <br /> be contributing. There would have to be some understanding between the <br /> parties concerned that if the funds were being contributed and the <br /> work is being performed, that the completion of the construction of <br /> that diel ro: I �_ :, or 'd�-�f�-- �-U.1.than_house.-, had,. to�s tt .ther,e,;= he. <br /> does not .f a y--his ..c -i n :' o l.d--be- =int _r.e-sted --in.--performing 'al-L,_this - <br /> engineering-,.. ork --.and- doing- . l 1,-he,- has ' gred_- o.-- do.-.in - _earl ie =,-_,commun- <br /> i cat i ons, not wi thstand l nig they di have to, address the zoning issue.- <br /> If <br /> ssue.- <br /> If the To n and the Board determine that one cannot build in that <br /> particular location, then this issue would have to be addressed such. <br /> as an eminent domain taking issue. ' hie suggests there would be no int- <br /> erest in performing any engineering work here .-or contributing to any- <br /> thing at that juncture. <br /> Ms Behrman suggested statements be avoided as to who is responsible <br /> for the creation of what, that he contact Mr , Virgilio and get back to <br /> the Commission. <br /> Li sa o f fered to attend any meeting with Mr. Vi rgi I i o, i f not f ed. <br /> Ms Behrman stated a properly en ineered plan *with exactly 'hat they <br /> are doing with the pipe and- any potential rebuilding of the bank -area <br /> will be needed. The topo should dontinue over both lots.- Fir, Cauley <br /> stated- he will provide--a plane. showing :-that- portion, of.. -he. layout.. <br /> M!r=:=.i osen berg stated .n f ormation --s pp.�.ie d- .t.o. -Ch art e s- Row 1 e-:-,shouId be <br /> part o - the <br /> Bi I 1 urr - ..ot . e ; od ire e,.-,asked what ffeet thi was going <br /> to have on his property, directly across the - streete The association <br /> owns nothing, slack Sullivan has given nothing to the association. <br /> Their lawyer is talking to his lawyer; forget about the association <br /> taking care of anything. What effect will this have on the transformer <br /> and his property? <br /> Mr. Cauley stated there is approximately 10-11 feet each side of the <br /> paved surface that is within the layout, ; it is thein intent that they <br /> work in that area. There... is 10 feet of grassed area on the uphill <br /> side of the road, on the transformer side, they do not intend to work <br /> directly around the electric transformer. He feels theresponsible <br /> person would call Dig Safe and have the appropriate locations marked . <br /> Mir. Ki crane stated if Mr. Sullivan has filed a Notice of Intent it is <br /> up to him to comply- with any Order of Conditions and he would imagine <br /> Mr. Sullivan OUld be the party- to engage . the contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.