My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/1988 CONSERVATION COMMISSION Minutes
>
11/10/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:03:58 PM
Creation date
2/21/2018 12:43:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/10/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ <br /> 1 <br /> onservati n\ omission <br /> Ro embl r 10 , 1988 <br /> .Page 5. , <br /> Hanscom: You' re saying they- are l e" ching catch basins, so they have. t <br /> leach- for a while before it. goes on .' If they fill ' up with material <br /> then they' re not go i-ng to be able leach and it' s g i rvg to oveflow <br /> much sooner. <br /> Simmons Isn' t there something they are doing ow in preconstruction <br /> that they put siltation screens in them so they can lift them out . <br /> Behrman: ,,I,' ire never seen anything lire that. <br /> Jacobson: Have hese catch basins been cleaned, to your knowledge? <br /> Lindholm: No. <br /> Behrman: That' s why I 'a. asking, how many houses have- -already been <br /> built that are going to drain into that systm that etre potentiarly <br /> uphill of it in a rainstorm-, and how many -more. do you have to go e <br /> might say once every five houses cle -n out the catch basins just to <br /> make sure. <br /> Mr. Porter showed the Commission on the plan what iz open now;- <br /> Simmons= Maybe we can suggest a maintenance chedu le urn i l <br /> construction is complete in the area and not er' schedule two- time' s a <br /> year, spring and fall . I -Would like to more on to themoon- t of f i.1 I <br /> you are goi- g -to be using. <br /> Ba tog: (Pointing to the plan) This lot involves a lot -or regrading of <br /> the or i gi nal material and this one ends up being 342 cu . yds. t,o bei <br /> regraded to create a flatter area. <br /> Behrman : How much of a flatterarea? <br /> Bay I og: It' s right in the rear. . . Behrman: How f"ar' <br /> Hanscom: Do you- have the 'l inn i o f ' the. , border ins Jand subject to <br /> flooding? (Bay log= o. want to know i f o e filling that or not <br /> , it makes a bi.g difference where 'you' re pitting the fill , <br /> x <br /> Baylog: I know what you' re. saying, you' re looking to see what the <br /> highest rater---level Mould be during spring. . . <br /> Burns= May I ask, you a question. Tina, these are proposed contours? <br /> 'Baylog: Those are proposed contour.s.. <br /> Burns: What are the contours right now? <br /> Bayl : They are abolu ely f -`t. , - <br /> Lisfrm <br /> read tine Act the de f in i�t i ori o f the boundary o the bordering <br /> land `.sub,ject to flooding. ' <br /> Hanscom: if you' re filling bordering l and 'subject~ to f I od+i,ng, %yogi <br /> have to c mpen .at , .an area, <br /> Baylog: This whole picture , if you too the original} contours, <br /> that' s right here at 'the lowest p} i nt, this area r ht her-e,, <br /> Beh man: It' s' - what' s ego in 'on with that It gaps around right, <br />
The URL can be used to link to this page
Your browser does not support the video tag.