Laserfiche WebLink
e t . r g PJ o * a b 1 7 1 9 8 <br /> comm i s s i overs resents Gertrude i mons, Louise Behrman, Patrick <br /> Coffey, Mary Marsters and Joseph Burns. Lisa Hanscom, Conservation <br /> Agent , was present also. <br /> The meeting was called to order at 7: 00 p.m. <br /> Christopher # ordis , 64 Buccaneer way, Continued from November <br /> John Slavinsky of Cape & Islands Surveying presenting. Plans have <br /> been submitted to the Board of Health. The septic cannot be placed <br /> closer to Buccaneer Way as lot 16 would become an u-nbuildable lot . <br /> Work limit to be at the deck with work on the deck done by hand. A <br /> system of gutters and dr rwells are proposed as well as a pervious <br /> driveway. The well is down close to the water for lack of room. <br /> Mr. Burns stated the test well was extremely large and beyond the work <br /> limit where staked. Also, all vegetation, was removed. <br /> Lisa stated it was at least 20 feet forward of the work limit. <br /> Mr. Slavinsky stated a 16 foot test hole is an extremely big hole. <br /> This was at ' s request, to get 4 feet below the bottom of the <br /> leaching facility. <br /> Ms Behrman asked why they did not do the test well where the septic <br /> system will be put and was told it would not be possible to get low <br /> enough. lir. Slavinsky stated DEQE sent a le-tier that the septic did <br /> not conform -to Title V and wanted a much deeper test hole on the lot. <br /> lie a8reed to look at the lot and suggested landscaping plans could be <br /> required in the Order of Conditions. <br /> Mrs . Simmons stated she feels that the area should be put back the way <br /> it was and eveg tat, d before any work starts. The ommission agreed. <br /> DEQE will be consulted. <br /> Lisa asked Mr. Slavinsky if he was saying that DEQE wanted then to dig <br /> down to a certain elevation He said that was right. Lisa stated, and <br /> because of that elevation it was easier for you to come forward and <br /> dig down 4 feet rather than back here and dig 8 feet. He steed they <br /> did dig a hole back there first. A 14 foot hole is pretty big for a <br /> backhoe. <br /> think about what he just said. <br /> Mr. Br suggested fir. Slavinsky should .h� ,� <br /> Lisa asked if any equipment other than a backhoe had been considered <br /> and was told that' s highly unusual . <br /> Ms Behrman stated that perhaps it should become usual . Mr. Slavinsky <br /> stated she meant a crane. <br /> Mrs. Simmons stated she would hope it would never happen again in a <br /> instance lice this. When DEQE finds they have been interpreted ars <br /> this way , they will be very upset. <br /> Ms Behrman suggested a conversation with the Board of Health re tests <br /> pits and coordinating with the Conservation Agent. <br />