Laserfiche WebLink
Conservation Commission ' <br /> December. 1 , 1988 <br /> Page 4. <br /> Mr . Cawley stated as long as these are functioning, the water will not <br /> build up to a freight that is going to top over. <br /> Mr. Rosenberg asked If he was saying there. is a berm in here. and he ._. <br /> said there is an ever so shallow brow, it is . 02 higher. <br /> Mr. Rosenberg stated their rim on this is only 73. 3. Pyr. Cauley stated } <br /> that it is 1 foot lower than the center of the road. <br /> her# Rosenberg asked if they were coming up to 75. 3 here. He stated he <br /> is trying to understand whether or not the water is going to b <br /> directed down this way or come off here and to what extent. <br /> Mr. Cauley stated presently in a rainfall event it does come to this. <br /> low point by nature of a shallow brow. He has no problem with showing <br /> than <br /> Mrs. Simmons requested a maintenance schedule,, <br /> Mr. Cauley stated they had prepared a r-eliinary . saintenance schedule <br /> but had wanted to speak to Ernie i r-gi l i o first, he was not sure what <br /> they want to do. <br /> Mgrs. Jacobson asked if he was not sure ghat Mr. Virgilio wanted to do, <br /> pow often a wants i t cleaned? <br /> Mr. Cauley stated he wanted to come up with a schedule, ask Ernie for <br /> his criticism of it, revise it acc Mrd i g to his recommendations and <br /> thea submit it to the board. <br /> Mrs. Jacobson asked if they were going to remove all the pipe that <br /> comes down and was told that was corr ctA. <br /> Mrs. Simmons asked how they were going to d • ghat. He stated their <br /> original proposal was to remove the first 10 to 15 feet. He felts. that- <br /> removing the rest would cause more damage. It would destroy the <br /> vegetation. In his proposal it is to remove everything between the. <br /> road and pit and plug it and leave it as is. <br /> Mrs. Jacobson asked if they were going to remove 30 feet and plug Lit . <br /> so nothing can go down th-e road and Mr. Cauley staged that was <br /> correct. The original concept was to stay as far array from the h ashpee.- <br /> Fier as possible, try to do all the improvements within the read <br /> layout. They do have a natural berm for a buffer. The major chrang <br /> since the last meeting was the overlay and the additional pit. The <br /> letter towards the cleanup. re money was dated 3/18/88. <br /> Mr. Cauley stated right now he has no interest in lots 14 and 1 , he <br /> has only been aced to resolve the drainage problems. <br /> Mr . Burns asked what was to happen with the leaching pit on lot 14 and <br /> was told that will remain. They have a proposed drainage easement. The <br /> disturbed areas will be regraded, loamed and seeded <br /> Mr. Cauley read from the Notice of Intent dated 7/22/88. DEQE has <br /> revised plans. <br />