Laserfiche WebLink
Conservation Commission <br /> December, 29, 1988 <br /> - Page 4. <br /> . - Bordering land subject to. -.flooding! Mr.. Lindholm, advised did an. <br /> analysis based on FIMA and a USCS comparisons He pointed to an area <br /> designated as Zone C, an area of minimal flooding. Zone C means it is <br /> not. in an area where flood occurrence can be- measured. Mean Water Line <br /> is at elevation 43 and All Cape Survey observed flooding fluctuation <br /> at abort 3' . Based on- that, high water is at 44.5. It is his opinion <br /> that the vegetation line is very 'lose to the high water mark* On <br /> Lot 105 there is no work within. 100" of bordering land subject to <br /> flooding. <br /> 5.1 Drainage calculations are, pro ided for the drainage swale at the <br /> corner. of Lot 4A. <br /> 68 - Maintenance Schedule for Catch Basins, Spring and Fall , during <br /> construction. A letter was submitted dated Oecebe.r 8 re maintenance <br /> of catch basins. <br /> Mr. Rosenberg asked if there was a lot owners association_ .and was. told <br /> there was not. He stated if there was one, it ' ould be a lot more . <br /> satisfactory to have the lot owners policing this.. Att . ---Castineti <br /> advised there are no common facilities,,' <br /> Ms Behroan questioned the vegetation- proposed between the limit o <br /> work and edge of the wetland, Ms Baylog stated it could be- conditioned <br /> it shoo l d- be.-ragetated.,. s- ehra . stated the Commission has an <br /> interest on a,.distrbed lot like this to provide a. vegetated buffer to <br /> absorb nutrients. It was agreed.- this is to be part of an Order o <br /> Conditions. <br /> Lisa advised Charles Rowley no longer works for the town. Review of <br /> the road drainage and storm periods will be reviewed by Scott McAskill <br /> of the planning board. <br /> HEARING CLOSED, ORDER OF CONDITIONS IN 21 DAYS. <br /> - : 3 0 SANTUIT WOODS*- LOT.- A-.,. -Continued Tina . BayIog -advised- -there .are <br /> staked hay.bales for the Limit, of work,. 43".- from the wetland; The <br /> dwelling is 86.6' from the edge of the wetland. ' The leaching facility <br /> is 141 ' from the -edge of- the retland. 15 cubic cards of clean fill <br /> -all be used for regrading.' <br /> Mrs. Marsters asked if there is anything permanent for maintaining the <br /> stability once the haybal s are removed. Mr. Lindholm stated the type <br /> of vegetation, <br /> ro. Rosenberg stated submission of a vegetation plan before con- <br /> struction. will <br /> on-rstruction. will be conditioned. He stated the Commission will not allow <br /> any lawn to the back of the houses. <br /> Ms Baylos stated they would provide a species list. -. <br /> Mr. Rosenberg suggested they consult with Lisa prior to the Order of <br /> Conditions being issued to. come up, with -something that i-1 l be compre- <br /> hensive enough to be part of the Order. <br /> Ms Baylos stated 50 eu.yds. - offill. is proposed and dryw l l s 1 ' from <br /> : the foundation. There is a retaining wall to 9 minimize the filling s <br /> ilIings - <br /> s Oehroan stated that should be labelled as such. Mr. Lindholm agreed <br />