Laserfiche WebLink
r Conservation commission <br /> March 23 1989 <br /> Page 7 . <br /> to address the concerns . <br /> Mr . Rosenberg stated she should as the Orden of Conditions cannot be <br /> complied lied with and an amendment would have to be requested . <br /> CONTINUED TD APRIL 20 , 1989 7 : 45 P ; . <br /> 8 : 30 John A . Sullivan , Tr . 5 fashpee Shores Realty Trust . Drainage at <br /> Lots is 1 15 Redwood Circle . Kevin Kirrane presented abutter receipts . <br /> He <br /> stated the only issue remaining to be addressed is to establish a <br /> schedule l for cleaning and -maintenance for the basins proposed , H <br /> and Lisa met with Ernie Virgilio to discuss his memo and concerns . <br /> Ernie suggested cleaning and maintenance twice a year , spring and <br /> fall , to be included as a covenant in each deed for Lots <br /> 14 and 1 . <br /> The purchasers would be responsible for the maintenance . It may b <br /> the desire of the dve Loper to combine <br /> the two lots and sell them <br /> as one <br /> Mr, Thorn of Arrow Eng i neer i ng adv i sed there w *111 be an overf low <br /> which flows into each leaching basin with three feet of crushed <br /> stone surrounding . <br /> After d i sous s ion , Mr , Kirrane agreed the order of conditions should <br /> relate to bath lots and will provide the names of the trusts -relating <br /> to both . <br /> Bill Stuart , abutter , asked what will happen to the drain on the <br /> other side of the street? <br /> Mr Tirane advised there is a proposal to add a leaching pit off <br /> the basin . The shoulder will be loamd and seeded and brought back <br /> as it is now , <br /> Coffeyasked if the covers on the pits are straight gids and <br /> Mr . <br /> was told they are solid covers . Water goes into the catch basin <br /> fills u goes out a pipe connected to an invert into the leaching <br /> • p � n and when i t fills <br /> pit at the top of the pit . The water flows do <br /> it seeps out the sides of the pit into the sandy soil . <br /> Mr . Coffey asked if there was an overflow in the curb to allow the <br /> extra volume of water so a few 1 eaves aren ' t going to give us the <br /> puddle that overta s the bank? . Thorn stated i needs to be <br /> maintained . <br /> Mr . Coffey asked if a <br /> bean was feasible to give a better margin . <br /> Mr . Thorn stated that would depend on the height . A vertical curb <br /> could be installed by the catch basin with a hole entrancing it ; <br /> the few inches might help . <br /> Mr, Rosenberg stated the commission will get an opinion and this <br /> can be conditioned . <br /> HEARING CLOSED ORDER of CONDITIONS IN 21 DAB'S . <br /> Mr . Kirrane asked the status of the cease and Desist Order . Ms <br /> Dehrman stated when an Order of conditions is written and signed <br /> the Building Inspector is copied . <br />