Laserfiche WebLink
Y <br /> ConCom n <br /> .duly 1:3, 1989 <br /> Page 4. <br /> Mr, Rosenberg stated the commission was the only people to <br /> put it out, they stopped it, but you can't put the house and <br /> the septic system in the same place, it had to go in front of <br /> the house or behind it. <br /> Mrs. -Simmons stated all public comments will be taken into <br /> consideration when the order of conditions is written. The <br /> Commission wants to save the pond as well and will consider <br /> whether the house should be built now or have to wait. These <br /> concerns will be addressed. <br /> Mrs. Kilty stated they do not want the pond to deteriorate <br /> any further. <br /> Mrs. Simmons stated the man has a right to build his home and <br /> the Commission will try to have the home do the least amount <br /> of damage. <br /> Luke La 1 ly came forward. He advised he is a member of the <br /> Board of Appeals in Barnstable which meets on Thursday <br /> evenings which precluded his attendance at prior hearings. <br /> He has owned the lot 20-25 years. The plans have been <br /> modified a numbeer of times at great expense and he has <br /> attempted to do exactly what people want him to do, He is <br /> very ensitive about the pond and feels they have gone the <br /> uil 100 yards and hopes to score a touchdown by the <br /> Commission ordering the proper Order of Conditions. They <br /> will make sure their builders will do a nice job; they intend <br /> to build a very mice home. <br /> HEARING CLUSED - ORDER OF CONDITIONS IN 21 DAYS* <br /> 7:45 DREW REALTY TRUST,, Lot 5 "fide Run, Continued from Jun <br /> , 1989. Dave Sanicki presenting. <br /> Mr. Rosenberg referred to comments from DEQE and lir. sanii <br /> stated he is aware they are in the ACEC and will address this <br /> s he proceeds. <br /> The board of Appeals has approved the 21 foot front line <br /> setback and footprint for lot Coverage. ACC is at elevation <br /> 10 covering of the lot. The flood plain is in elevation <br /> 11, closer to the roadway and even more of the lot is within <br /> the flood plain. They are proposing a modified verrsion, a <br /> smaller 4 bedroom home. Mitigating measures are roof drains <br /> for runoff. A swimming pool with Ozone system is proposed in <br /> the rear, equipment to be stared beneath the deck. <br /> Concerning backwash for the poo; , within the area around the <br /> pool they are proposing a► dry ell (capacity of same is shown <br /> on the plan) for backwash to address any concerns for direct <br />