Laserfiche WebLink
i <br /> August 24 , IL989 <br /> Subsequent to the- public hearing, the Commission adjourned to the <br /> Conservation Hearing Room. <br /> the Meeting was called to order at = 35 p.m. <br /> 7: 30. COLONIAL GAS CO. (Coastal Engineering) Fond Circle. Bob Dowling <br /> and Karen Blanchard presenting. This 2n gas main will tie into an <br /> existing main which is the reason for it being on the east shoulder of <br /> the road. They will be 304 deep, a minimum of 18" . silt barrier is <br /> proposed along the pond side up to the existing split rail fence. <br /> Mr. Rosenberg asked if they will go under the runoffs and was told <br /> they will go through thea, they are spillways, and then repair them. <br /> 4r. Coffey stated Colonial Gas has always done fire by the Commission, <br /> he could not imagine there would be an issue with this one. <br /> Ms Eehrman suggested, at the location of the two runoffs, that the <br /> screen by supplemented with haybales. Mr. Dowling agreed. <br /> HEARING CLOSED - ORDER OF CONDITIONS IN 21 DAYS. <br /> 7: 45 COLONIAL GAS CO. (Coastal Engineering) Monomoscoy Road. The <br /> main will be " and the wetland it is going by has the concretehead- <br /> wall with the pipe beneath. There is enough clearance with an <br /> elevation of 14 and grade at the road of 1 . There is ' , minus the <br /> foot of the pipe. The main will end at the utility pole, 41-1/2. <br /> Ms Behrman asked how far they will be from the edge of the pavement. <br /> Ir. Dowling stated in some cases it would be the width of the bucket. <br /> They will not extend over the edge of the headwall . <br /> Mr. Coffey asked if the " main would be sufficient for expension use? <br /> Mr. owl ing stated going that way, yes, you can get to Great Neck Road <br /> South. <br /> CLOSED -- ORDER F CONDITIONS IN 21 DAYS. <br /> * 00 ROBERT HANSEN (Wm.M.Warwick & Assoc. for the construction and <br /> maintenance of a ' x ' addition to an existing dwelling, swimming <br /> pool and adjacent wooden deck at 63 Keel way. Susan Asmus presenting <br /> with Barbara Johnson. Mr. & Mrs. Hansen were present also. Board of <br /> Appeals approval was received on August 9 for a structure within 50' <br /> of the wetland, written verification not received. <br /> The pool will be installed by Cape Cod Fools, pour concrete " <br /> thick with reinforcement rods. Excavation will be from the upland <br /> side with material removed immediately offsite. It will be ' deep at <br /> the north end, opposite the whirlpool . The 20, 000 gallons of water <br /> i l l be from Highwood Water, a one--shot deal . For winter storage, the <br /> water will sit for two weeks without any addition of chlorine to <br /> dissipate whatever chlorine i s- in the water; 18" will be drained from <br /> the top through a 6 x 8 x 5' dr ywel l located underneath the elevated <br /> deck area of the stain. <br /> Mrs.. Simmons requested specifications on this. <br />