Laserfiche WebLink
Conservation Commission <br /> ` November 30, 1989 <br /> Page 1 1 . <br /> Mr. Coffey stated the graphics on the Beech tree areamusing, the 5-6 ft. Beech <br /> tree to be put in covers half the front yard, the one taken out is a dot on the <br /> maps <br /> Mr. Sanioki advised this is someone else's rendering. <br /> There being no further questions, the Chairman declared the hearing closed, <br /> CLOSED - ORDER of CONDITIONS IN 21 DAYS. <br /> 8. 15 J. W. Taylor (Lagadinos Construction) for a Determination of Applicability <br /> on a proposal to rebuild an existing dock at 253 Pop ones set Island Road. Nick <br /> .f <br /> Lagad i nos presented abutter receipts. The end of the dock will be raised a min- <br /> imum <br /> einimum of 5 ft. above high water tidal mark in anticipation of new proposed reg- <br /> ulations. <br /> Mr. Sherman advised he ret on site with Mr. L g d i nos and told h i raising it would <br /> comply with Chapter 91 in the sage footprint, Also, spacing the boards for sun- <br /> light to penetrate is an overall improvement. <br /> Mrs. Simmons stated she would like more detail . <br /> Mr, Burns asked the length. <br /> Ms Behrman advised the total length ofthe stationary art is 44 ft. She stated <br /> any building materi a l s should be stored inland and this should be noted. <br /> Concerning the poles, the Commission was advised it is proposed to pull them <br /> out and use the same boles. <br /> Mr. Duras asked if it was salt marsh underneath' <br /> Ir. Sherman advised it is fragmi ies going into salt marsh. <br /> Mr. Lagadinos wrote In building materials will be stoned under- the deck of <br /> the house and initialed this. <br /> Mr. Coffey asked for the building techniques. Mr. Lagadinos stated they plan to <br /> take the boards off the deck and have two stringers left on the side, detach them <br /> and pull the post out and put the new one i n. There is no concrete involved. s <br /> they work their way up, they will build the deep behind them. They are replacing <br /> with pressure treated 4 X 41s. <br /> Mr, Sherman requested that Mr. Lagadinos also initial that- there will be 314 inch <br /> spacingbetween the planks. <br /> Ms Behr man suggested a Zerox be sent out of the final request with the finding as <br /> a reminder. <br /> Mr. Coffey asked how they would remove a rotten piling if it breaks off and was <br /> told they would jet it out. <br /> VOTE: Motion made and seconded for a Negative finding. <br /> NEGATIVE DETERMINATION. <br />