Laserfiche WebLink
Conservation Commission <br /> November 30, 1989 <br /> Page 5. <br /> B ENR IA I: Specifically, and the approved work. The implication in this language <br /> is the project that has been approved so that there is a paper trail . <br /> SLAV ISKY: Of the actual location of the work. <br /> BENR AN: Of the actual locaitori of the work; the location o the work implies <br /> what work. <br /> SLAV I NS Y: That' s pry problem with this one, <br /> BEHR IAI : We' ll take that under advisement. <br /> PATRICK COFFEY: Now would you word it differently? <br /> SLAV I SKY: I 'm not sure, we're looking for a plan that shows Lot 5 Tide Run, your <br /> that's okay. <br /> BEHR AN: If you filed a plan with us that shows Lot 5 Tide ruin, .your plan also <br /> shows what you are proposing to do on it and that plan is ghat is referred to <br /> in the Order of Conditions, (Slavinsky: In the Order of Conditions) and that <br /> plan that is referenced in the Order of Conditions may be required to be recorded. <br /> LAVINSK : Okay, that' s what y ou're saying, recording of that particular plan. <br /> SHE SAN: It' s the same plan that you've always turned in to us, now they're <br /> going to be recorded. <br /> SLAVlNSKY: Well , that' s not exactly.. . HER A : That's the language of the State <br /> Okay. <br /> DAN NOIEYER: It does not state in here, are you going back to what we had in <br /> Chapter 91 , the final order of determination or notification. Is this on new <br /> work or pre-existing structures. <br /> BEHR A 1: This is for any applicaiton that is made under State Law by 10/10/89 <br /> and as far as Town Bylaw is concerned, any application that is rade to the Board <br /> as soon as the Board adopts this regulation. <br /> H EYER: In other words, if 1 cone in. . .(BEHRMAN: We can 't post date, we can't <br /> require anything of five ,years ago to come in) . I l cone in and say I 've got <br /> seawall that's falling down and want to repair it, then I 'd have to have. . . . <br /> (BEHRMAN: fifes, so we'd have a plan as of this date of what you' re applying to <br /> repair . <br /> HERMAN: If you have an existing structure the same size and configuration you <br /> wouldn't necessarily have to come up with one. <br /> HOMEYER: The Array Corps of Engineers on 1/16/85 stated it was pre-existing 12/16/68. <br /> BENR iAi : This does not apply to Chapter 91 at all ; this is the Wetland Protecti n <br /> Act, a completely different kettle of fish. <br /> HOMEYER: Still and all , as long as it's pre-existing and you're repairing. . . <br /> (Simmons: As long as ,you' re not changing ,your footprint. <br /> SHER A I: As long as ,you don't change footprint,, s i or usage in any markable <br /> way, you probably will not require this. <br />