My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/30/1995 COASTAL RESOURCE MANAGEMENT COMMITTEE Minutes
>
8/30/1995 COASTAL RESOURCE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:06:09 PM
Creation date
2/22/2018 1:42:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COASTAL RESOURCE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Ocean Arts in. Falmouth, who deals in the treatment of waste <br /> water. Mr. Fudala amended the motion to include inviting Thomas <br /> Camra re r i .of the Cape Cod commission sine they will be doing <br /> a nitrogen loading study. The amended motion was seconded, <br /> and unanimously voted in favor. fir# Cadr i n noted that a MACC <br /> Coastal Workshop has been scheduled for September 23 , 1995 <br /> relating to this topic. Mr. Baker brought up dredging and the <br /> doss ' bilities for funding it, .i +e. Waterways Improvement Fund, <br /> a bond issue, $21 , 000 from the Windchime Developers . fir. Fudala <br /> stated that the Windchime funds are targeted to study the impact <br /> on the River from that development ' s wastewater treatment plant, <br /> which has not yet been built. Mr. Whri tenour stated we- should <br /> focus on gathering data, and we will find the funding for i t i <br /> Mr. Danks noted that Waterways commission is looking into -the <br /> dredging aspect* Mr. Fudala distributed a handout re: a Seaport <br /> Development anent Bond Bill which passed ire the House, and he noted <br /> that there are funds for non-designated port areas ( $25 , 000 , 000 ) 9 <br /> Mr. Hanks stated that a sub committee will be formed to work <br /> on creating a plan to address the concerns about the River. <br /> The meeting neo-gyred on to other business. <br /> The two--foot dune restoration and Po ponesset spit remedial <br /> planning were postponed until the next meeting. <br /> South Cape Beach update includes a second boardwalk (with <br /> stone) that was approved by DENS. :. <br /> -- <br /> The Wills Work Road date will revert back to the old system <br /> of ter Tabor Day. <br /> Storm runoff mitigation was postponed until the next meeting. <br /> - Coastal Resources Information System could help Department <br /> of Marine Fisheries for sampling hack through time (possibly <br /> see a negative trend) * Rick York has files on this . DMF does <br /> not want to hand out any information ion that could involve people <br /> getting into their management deci s ions <br /> - Boat sewage pump-out facilities will be an informational item <br /> for this Committee, and the Committee was in favor of having <br /> Jim Hanks do this. Mr. Hanks reported that 80 100 gallons <br /> a geek are being pumped <br /> - <br /> Stairway at Wading Place Road was deferred and re-vegetation <br /> with rosy rugosa was recommended with -volunteer effort. The <br /> Committee decided to table this issue. <br /> Tonal Comprehensive Plan status update was tabled. <br /> �2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.