Laserfiche WebLink
Public Works Building Committee <br /> Meeting of October 10, 1984 <br /> Page 3. <br /> El 1 i s Laycock stated the surveyors should come before the committee to answer <br /> for th-i s error* <br /> Town Counsel advised that the contract requires an adequate work force be main- <br /> tained <br /> iain!taireed to erect the building at a speed satisfactory to the town. The town is <br /> unsatisfied with the number and quality of workers, Ellis agreed to send a <br /> letter to Triple A in this regard. <br /> It was agreed that the contractor should have a dumpster on the site. Two men <br /> from the Highway Department have been spending 4..5 hours per week cleaning up <br /> the area, at the town's expense. <br /> Ernie vi rg i l io stated that he would move the 5000 yards of excess fill from the <br /> s i to at a cost of .40 per yard,, $2000. total . Mr, Masas ch i must remove the dirt <br /> from the trees first. <br /> Ellis Laycock reviewed proposed change orders received October g from Triple At <br /> #1 . Dated 9/28/84 from Masas ch i <br /> Site work caused by building movement 40 feet. North side, <br /> extra clearing, grubbing , cutting & filling 1 1 acne. Corrected amount $2859. <br /> Request for extension of 12 calendar days,, <br /> #2. Dated 10/2/84 from Masasch i <br /> Making d i ko shaped berry. Clearing & burying, grading berry. $2730, <br /> #3. Dated 10/2/84 from Masaschi <br /> Putting hardener on site. 800 cubic yds @ 2.75 per yd. $2200.6 <br /> with mark-up $2640, <br /> #4. Raising the excessively excavated building. $2508. <br /> with mark-up $31304, <br /> Mr. Masas ch i stated in his letter that it was too late in the season for his firm <br /> to undertake the paving contract. <br /> John Wyllie stated the easement for the bean was to allow the contractor to avoid <br /> haul ing away the excess f 11 * Al so, the easement the town gave the contractor to <br /> bury the 'Stumps should be considered, a' this increased the volume of the excess <br /> There should be a change order for the burying of the brush. The hardener for the <br /> site is part of the contract* <br /> Reference was made to the meeting of September 26, wherein Mr. Cohen stated Triple <br /> A would absorb the extra for the fill ander the building. <br />