Laserfiche WebLink
Mr. Aaron Cohen page 2 October 30, 1984 <br /> October 1, 1984-relative to creating a berth on the south side of the <br /> lot. The piles on the south side, including stockpiled topsoil which <br /> will be ultimately spread on the banks and areas to.be planted out, <br /> The sand piles will be spread evenly along the side or delivered to <br /> the north side ravine if not yet stockpiled. The berms will not be <br /> built <br /> Therefore it would appear that some extra charge might be granted for <br /> extra material being out from the site if'a justification can be shown <br /> that removal of the original volume of excess material from the site is <br /> less expensive than cutting and filling toward the hollow to the north <br /> of the now anticipated greater volume of material to be cut. We do not <br /> bel leve thi s i slue has been propprl y addressed i n Masachi I s l etters to date. <br /> Because it has taken us some time to sort out this situation, I believe <br /> you should be allowed some extension of time to the completion date, <br /> But we still need a proper breakdown of c red i t and extras charges based <br /> on the ori gi nal excess material bej ng re-moved from this site versus the <br /> ultimate material being allowed to' be placed on' site. <br /> Hoping to hear from you soon regarding this. <br /> Sincerely, <br /> ATLANTIC DES & CONSTRUCTION, INC. <br /> f' <br /> r <br /> iayc k <br /> EEL/bim <br /> -ec Sam Ray <br /> L <br />