Laserfiche WebLink
Public Works Building Committee <br /> Meeting of December 12.9 1984 <br /> Page 3. <br /> Mr. D�l�a <br /> • gg i o stated he s i not questioning what was done, or the work that was <br /> done, � site was of <br /> He spent an hour at the and agreed that the work completed <br /> excellent goal�t <br /> • er. He stated h �e i s only questioning the fact that it was called <br /> an emergency, It maY have been an urgency} but not an emergency. <br /> Di Ma i o had some concerns that the laws of the town were <br /> �Ir.* Re stated F�f -Mr t �� not the committee. <br /> not followed, i t should be pursued with the proper parties, <br /> • ntract Mr. Virgilio presented f i gures for the <br /> In accordance with the state co ,� re are for paving. � <br /> work on the site on a day by day basis. This work top p R <br /> formal billing from the contractor is forthcoming. <br /> J. T. Higgins, Contractor $1 3,355,00 <br /> 1 Friday 1 labor <br /> 1456,56 <br /> Town of ashpee <br /> J. T. Higgins, Contractor $39935.00 <br /> l������ -� Saturday , <br /> Town of Mas hpee labor l 14836 <br /> 36 <br /> J* T f Higgins, Go ntracto r $49075.00 <br /> 12/9/84 Sunday e labor <br /> 700.16 <br /> Town of Mashpe <br /> T. Higgins , Contractor $1 S.800.00 <br /> 12/10/84 � Monday i <br /> Town of Mash pee labor No Cos t <br /> Description es cri tion provided of services and labor. <br /> Totals: Contractor -PO#3011 $11 ,165-00 <br /> Town labor PO#3012 25305.08 <br /> Grand Total $13 470-08 <br /> ctor coordinated his work Mr. Virgilio stated the contra k with them. The handed each and even rove t <br /> together with equipment was cons derabl e. He 1 ogg <br /> work g i <br /> He showed the committee pictures of the sand Masasch i put nto the site. He <br /> � removed debris, <br /> d to cut trees to put the excavated ted s and into the ravine. <br /> had The man--ho1 a to <br /> d the as pit area, which had to be drone by hand.excavated � R F he stairs. He also had to set up grades, <br /> the gas trap d�d not l�ne up with t grading n con- <br /> ' equipment and by hard in preparation for rough g g • <br /> Excavation withthe area. specified f�ed and moving <br /> si sted of moving 17 b0 total cards of sand n R opened <br /> ` atel same amount of hardener. Af ter the gas p*t was op <br /> back n approximately <br /> d reinstalled,tal 1 ed' all the pipes and i t was back- <br /> again, <br /> ack <br /> agoin, the plumber came back an F d and rough coding <br /> ' Sunda the excavating and backfill was complete g 0 <br /> filled, � s etti n well pit and reinstalled <br /> of 75% of the area involved. Completed 9d catch <br /> i Began an enortous amount of hand work in grading aroun <br /> water mainv g <br /> aces were on, which had to be removed and the <br /> basin that the frames and grates as trap vault <br /> u to rade. Performed masonrywork t Moved g }p <br /> area brought p g incorrectly done by . Monday <br /> corer in 1 ine w-ith ladder which was nco He oirted <br /> ' din was done which was no <br /> part of the contract. p <br /> the fine gra g <br /> 11 worked four hours free of charge to the town <br /> out the contractor actua and he agreed to help fin- <br /> because it was under the fine grading i agreement g toted <br /> He stated he feels i t i s a reasonabl a bi 11 . <br /> He also s <br /> i s h the work. d the call of duty as he get S <br /> that working Saturdays andunda, s s began <br />