My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:55 PM
Creation date
2/22/2018 1:58:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
x <br /> Publ } Works Bu i 1 d i ng Coma i ttee <br /> Meeting of December <br /> Page 4. <br /> • F •n .- (Continued) • the <br /> Ernest Vn rgi 1*o speaks f Selectmen to review <br /> • has asked the Board o . <br /> • n a sal arY basis,• ale days <br /> o <br /> pall ° additionally far those <br /> matter and pad h�m and unday <br /> overtime rye nate was $5+00 per <br /> hour for Saturday <br /> It was noted the ove ota1 amount charged. <br /> • is included in the t F o <br /> and this <br /> contract i s one of the <br /> antras for who has the + t was $3900.r# Virgi1io stated the c and -the equiprient cosvery <br /> W s cost was $7200. ].� �f <br /> yearly bidders, l I 't to go out to bido <br /> • the $4000 bi Ic Works creW �e�� verb <br /> wh1ch s under job d th aea rtmer►t of �u <br /> t f l e d T� t the <br /> withthe new <br /> building, <br /> lc and ecl <br /> enthusiast' e of loo tons <br /> ��i tte� there was an overage �t 1�V��� �� <br /> io also advised the co the estiated 1 ,DD0 <br /> Mr, Virgil ` increase.. instead of area around the build- <br /> on <br /> the pave ng s a 25 n of the fence and the <br /> � foot area in franc <br /> 15,000. The paved have been done. <br /> n not scheduled to be pthe bui ld- <br /> � g <br /> 0 <br /> far ashal t from the roa d to <br /> re was always <br /> $4,000 first 1 was pi anne <br /> Mr. Re stated the the site looked like <br /> ' n 1 t Was real ped what with the , <br /> ng the �� he archi tett agreed <br /> be used., then and t ul ed to be <br /> d i n areas net sched • <br /> • tarns more were use t et i n until ch <br /> . Vn rgi11a IS •n as the paths may no g <br /> Mr Pa <br /> u to the bu i 1 d <br /> paved r They P <br /> 1 ater+ has lane is accept� <br /> - f the �ra�ent, What ha south side of <br /> } that in the urger+e o be cut out around the <br /> 5 <br /> Ellis statede planters should }snow what <br /> 1 e. in the spring th <br /> ah vice of drivers will <br /> automatically . <br /> F so the most no well-being of the building <br /> the building • wi 11 add to the wel <br /> do i n the y and and t <br /> to was a state of emergency t <br /> } i n that there real 1 the bui 1 d i ng <br /> aced t was h i s feel a fully expects <br /> Ellis al <br /> so stated assibl a av�ng. <br /> ek of new supers ntendent has <br /> as <br /> i t was i n the last we month. e stated the n <br /> ' i shed the middle of reg <br /> to be fin' <br /> n <br /> things Wel 1 1 hand. • a 11 ahl a to the <br /> i <br /> � � �� � log or et�zlrate �� �� ��,�i � �� <br /> i asked Mr.* ��rg�1�a d for carrectn ars of e <br /> Anthony ��prent�rr <br /> states the coni es expended _ .t and gas traps <br /> general contra►ctar` thatsuch as the well <br /> 5 rad i ng s <br /> Masasch� , <br /> other than rough D <br /> . e <br /> figures have to hedefended,,. <br /> he can defend �. <br /> j i t ilio stated if th <br /> Mr. I •r i 1 i a s presentat1 on <br /> comments an Mr.. D 1 d h ave to meet <br /> Re asked i f there were•any, d maybe <br /> Mr. Virg" <br /> 1110 wau <br /> Mr. R sees no objection an Y <br /> 11is stated he <br /> with Aaron Coh en� invoices from the <br /> i tte a would await thewith the <br /> 1 Mr. V i rg i l i o the comer e :paving ng i n accordance w t <br /> Re informed for $12,9200* far th er the cosre uisitionto the building and � <br /> contractor, A ,� for paving n ng u R as yore. �e <br /> rove ded had $4,,000 ao# which i s �90 <br /> esti mate he Th1 s now becomes %1 types <br /> off tures. <br /> ecast added $9AI . r putting i n d ff erens eci al <br /> for OoD f o the P <br /> i n. th a forreca s t $1 e of this through <br /> also had • l d have to take car <br /> He stated Mr. �rgi1 na Wou <br />
The URL can be used to link to this page
Your browser does not support the video tag.