My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:55 PM
Creation date
2/22/2018 1:58:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Public Works Bu i 1 d i-ng Committee <br /> Meeting of December 12, 1984 <br /> Page 6 <br /> ed a co of an estimate from Randall Aronson of <br /> Ernest-Virgilio present �� <br /> Marston mills for vinyl asbestos ti 1 e o 1 875 square feet of tile with <br /> 650 linear feet of cove base - $3200.00* <br /> • rice of $2480, and has a meeting tomorrow <br /> Anthony Fri orenti ni stated he has a <br /> to find out the type of tile that was quoted on. <br /> committee a copy of a quote from Padco Inc* of <br /> Mr.� Virgilio also have the <br /> Worcester plastic er for lar i nate counter top $1 !,020, for <br /> counter tops only. <br /> of compliance from the Board of Health is in <br /> Mr, Re stated the certificate <br /> ha <br /> "ard■ �The have asked that the contractor take the drawing n that was sub• �� <br /> mu "as and change It to the as built • <br /> Mr, Virgilio o stated Lenore Anderson told him he could do i t■ <br /> Ellis asked hire to please give him a copy when finished. <br /> supplied In the foundation is substandard. <br /> Mr. Re asked Ellis �f the concrete pp <br /> to -the letter from Lawrence Ready-mixed <br /> E1 l�s gave Mr.. Rea 1 ette r responding. <br /> credit I n the range of $1600. should be 1ooked for. <br /> concrete and stats n� that aor structural concrete - <br /> t of three sam l.es are within <br /> two out � do not have t <br /> of the 3000 1b.t concrete vari acceptable norms f ety� but y ou ���� 1 b concrete. It <br /> e tabl a but i t i s not 3000 l b t concrete. In two instances, <br /> all three <br /> is acc � <br /> • <br /> cylinders tested low Two-thirds are low and one-third acceptable. <br /> It was agreed to study <br /> the matter and .take it up at the next meeting. <br /> Reardon that Ellis is going to notify the bonding com- <br /> Mr. Re informed Joseph Re ed he had cal 1 ed Ruth <br /> pa ny <br /> of the action the town has taken. Al so, he stat <br /> . Paven, counsel for DOO, who stated everything was .doge as it should e. <br /> Mr. Reardon <br /> stated everything that was done i s legally correct* <br /> out for bids on the use of construction equipment, <br /> Mr. Re stated the town went - ds was low on a weekly <br /> bulldozers <br /> andackhoes* i n <br /> May, The two bi dders, Chi 1 <br /> nate and Higgins was low on a daily rate. <br /> • don that. the matter was brought up because <br /> does a o explained to r* Rear felt Mr.■ Virg i l i a <br /> ed he was a coached b three contractors who • <br /> he had stat i i n this out for public bid and also, <br /> had overstepped h s bounds by not putt not read <br /> that this was not <br /> an emergency s i tuation because the building i's y <br /> for occupancy. <br /> • for bids was changed at the annual town meeti n� <br /> Mr. Murphy advised the figure pure o <br /> I ast year from 2.000, to 4 5000. <br /> S <br /> 3' <br />
The URL can be used to link to this page
Your browser does not support the video tag.