Laserfiche WebLink
y <br /> Building Committee <br /> puhl� Works <br /> Meeting of December12s 1984 <br /> Page 7. ilding <br /> much how soon the bu <br /> were not so mclose down, <br /> Two <br /> h a1 s� �toted the concerns e �� �al t ��ar�.ts ��u � ne��i d ����t <br /> Joseph burp � the fact that th � t�n �nareas ed th <br /> e occup*ed but annual town meeting or bid this past year <br /> could involve first then has gone out f <br /> rs were i nv d1 , the tow a re as on bei rig the <br /> factors � ��� and sec � ed two bi ds� Th <br /> from $2oOOOto � _ �, onl� rece�� mmitted to the town <br /> fration equipment and � bidder would be co <br /> f�r cons very busy and as �a rjob, <br /> contractors are , , i ttee tonothe <br /> called ed and might be ce <br /> when dirt on the east <br /> e nd q one.-third of <br /> 1 ar e pile of then be graded to a <br /> dv�sed there 1 s a g i ne so that I t can •f this should <br /> Mr.R Re � carted into the ravine <br /> our and asked Ellis � <br /> which has to b he o-rig�nal cont <br /> one slope up to t <br /> two to done <br /> ed to be Mr. cacti er sal <br /> d <br /> groce Tobi a, who <br /> to reach a ��'. . <br /> s been trying n able to reach him* <br /> Ellis stated he has but have not bee <br /> interested in the fill ,) ked if that work <br /> was me" been spread. He as <br /> dener had `ttee spend the money <br /> advi sed all the lar d <br /> should the o° � <br /> ah es to r Town it lea real problem and <br /> dine es n t R <br /> is fi11 out if Mr. T <br /> t and <br /> take the • attempt to <br /> remove <br /> to a t p <br /> raptor was maks ng ani but this could be <br /> asked if the cent or the salt shed the complex <br /> jeseph Murpb s sac to out n f the i ntegri t of <br /> it �ou1 d be Haas y is s not aruc�al to <br /> stated F rnal 1 Y* If <br /> t <br /> accomplished Mme <br /> ` coo 1 d sit there.�t s to the contractor <br /> e excess f"11 belong and lees <br /> • ontract states <br /> the a sl ope I s excessive <br /> i s adv i sed the c wan <br /> to remove* Th rest the probl erg. <br /> E1 he does not wa <br /> call e f.11 you would correct d. <br /> but g bass as you remove th out d be retal ne <br /> a ro bl em, but y o the town and should <br /> posep •s an advantage t <br /> � El 1 i s stated <br /> The material • he slope <br /> • s bid on 1 ncl ude t <br /> • the s pec i f i ca t i ori <br /> r R Brown asked 1 f s i c 1 an <br /> following the ba P <br /> •t should <br /> `t i nal odes i i nal Sob <br /> • art of Masaschl s or <br /> '} toted i f this�s �s .p � • ati on of the work. <br /> Joseph Reardon s �n anti c�p <br /> into the hack chargefor the salt <br /> be figured i n to cut the ban <br /> ` if i r i 1 i o goes use at the land <br /> ted when Ernie i al for eventual <br /> Mr, Murphy s ugg�s stockpile the mate` <br /> it then <br /> shed he slope }� <br /> the ra l ne. removal <br /> or dump <br /> it n e far the <br /> • e to try to arra ng <br /> It was agreed that <br /> Ellis should conte nu <br /> of the <br /> fill , if possible. for the removal <br /> ctor wants to arrange i n it for him, <br /> at i f the contraposition of doing <br /> fur by stated that Should not be I n the <br /> Jos eph P <br /> but the town s�► l have to <br /> it is all r gh t, Aaron Cohen w� <br /> • does <br /> want the fit <br /> • d i, -,Mr.. To.h i a d <br /> Mr. Reardon advise <br /> give his approva <br /> k <br /> s <br /> Sr: <br /> I, <br /> 1• <br /> I° <br />