My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:55 PM
Creation date
2/22/2018 1:58:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Public Works Building Committee <br /> Meeting of December 12, 19B4 <br /> Page 8.6 <br /> f 's cheaper for the town to purchase <br /> advised the Tommi ttee 1 t He also stated <br /> Joseph Murphy 1 labor to take it out�.of the s�to. <br /> the fill than to use town to al l�� the removal of f"11 <br /> 1 <br /> there <br /> is a mechanism, after public hearings. <br /> from the town* <br /> b Mr,. 1�i rg i l i o cv r�cern i ng th e <br /> sed that a letter has been written Y The further <br /> Sam Re adv a caused by Masaschi equjpment <br /> grooves 1!� the road at the site stated the committee i n not involved in the matter. <br /> • he received concerning the court <br /> Ellisadvised the committee of information armati on � the mason and <br /> ed into the vehicle was used by <br /> sus t Thenachi machine that bump • d b the mason. In essences he <br /> the man whose a vehicle was damaged I's employe <br /> will be suing his employer. <br /> • i Arany-hales being installed wi thaut <br /> to John Wyl l i e s question re_the a H-20 cover is <br /> In answer oven does- net requi re a plug �f <br /> the plugs, Ellis advised the t <br /> usedw <br /> seven day test on the second <br /> morrow will be critical�t�cal with the i s frozen., <br /> Mr. Re stated to re is concern that the concrete t <br /> l oer concrete and the apron. There <br /> the <br /> • • He conducted some tests and <br /> stated ted he does not feel I t s frozen.e n. <br /> Ellis test but the remainder of the apron <br /> ere the apron is cracked would not <br /> area where � <br /> is all right. <br /> floor would comply with the rules perr- <br /> a I o asked Fl l i s f the a second l d not be stopped• <br /> Joe DiM gg order that federal funds would <br /> taining to the handicapped in <br /> • si bl.e. It i s locked and will be <br /> Ellis stated the second floor �s not acces F the building and the <br /> ul law requires accessibility to <br /> used for storage. The <br /> toilet facilities and not to every floor, <br /> i n has been paid $827-00 to date. <br /> Fiorenti ni advised <br /> American Testing g The bill In hand <br /> Anthony • ormation on the <br /> items in dispute <br /> e has the dates and of him i n order to avoid confus� <br /> be ai d.� Town Accountant*has <br /> advised � d to bring it up <br /> should he ori i nal purchase order issue <br /> ion, have a supplement tot g ince paid, disputed amounts can <br /> to date <br /> for this s bill and expected bills.he provided to Ellis. <br /> Ellis stated he has not seen any <br /> reports on the slabs <br /> agreed <br /> to wait until next meeting so rep <br /> arts can be reviewed before <br /> it was g <br /> taking action on the bi l 1 . <br /> i He stated he talked with Joseph <br /> Mr. Re read a letter from Mr. Masasc for the f it He then <br /> d was advised to provide an interna memo committee was <br /> s <br /> ! <br /> Murphy an the Selectmen and comr��ttee. The F <br /> read a proposed l etter to <br /> ' agreement and also. agreed that Ell <br /> is should send a reply to Mr., Mas a s c i . <br /> i n ag <br /> 1� - <br />
The URL can be used to link to this page
Your browser does not support the video tag.