My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:13 PM
Creation date
2/22/2018 1:58:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 4 <br /> Publ i c Works Bu i l di ng Committee <br /> Meeting of December 17 , 1984 <br /> Page 4. <br /> Review of Requisition - continued <br /> . - anything to date. One-third of painting complete, <br /> Painting ng - $68406 Not pal d anth � ��� complete. <br /> �on Equipment <br /> - $250 asked � not allowed. <br /> Service Stat <br /> . <br /> 1�1r, �#�rg i l l o stated he saw a masonr truck drive over one of the arms on the <br /> � <br /> • ch ec ed and saw that i t was bent* Ellis stated th�s is a corrective <br /> j�ft. �e <br /> item and he would look at it. <br /> l to - allowed $10,840. The clerk contends <br /> Plumbing - asked $12,340. 7g� comp e <br /> 's because Aaron cohere has put in for an amount <br /> that was already included <br /> this i <br /> in a change order. <br /> 'ttee material fromom Maurere1 stating that on thi's requisition <br /> E1l �s showed the comms complete l�#���.��. Ellis referred to the list s t of d <br /> i <br /> s <br /> for plumbing he wants $ ,d <br /> to filed sub-contractors b Triple A which states Laurer was pay <br /> bursements <br /> .ved no payment on <br /> of $65175-00. he pointed out that Maurer recetotal to date the <br /> e last requisition i s i ti on as the, did not put i n farplumbing. <br /> stored - total �0,040. cut to $1�' ,540 plus <br /> ��A� asked $195040 plus $1000 _ <br /> $1000 - 83% complete. <br /> ' the front panel of the furnace is dented. <br /> John 1��r1 l 1 e advised the committee <br /> Electrical - Asked $105000. � � complete -- $9 ,000 plus $43,860 stored. Paid <br /> ��� c em� <br /> to date - $19,9108, <br /> #2 <br /> included <br /> is <br /> Ellis stated Triple A has paid $6,047-50 and he believes change order <br /> included i n the amount. <br /> n1� aid the pl umber $300. , i s i t not in <br /> Mr. Re stated that �f Tri pl e A has o p . <br /> as than e order stated $434. should have been paid <br /> order to ask why g <br /> d will consult with Aaron Cohen. <br /> Ellis agreed an <br /> . <br /> paid <br /> for the floor drains as <br /> John Wyl l l*e q <br /> nest'oned whether Maurer was pa <br /> al l awed In change order #1 . El l <br /> S stated Maurer was pay d $798.00and Mr.. Re <br /> re a es ted that he find out why. <br /> g <br /> Was 3 phase, now on single <br /> compressor sor for lift and air l i nes i n garage. <br /> p, of <br /> Gas p 1 for a change order to cover i n the amount <br /> phase and per request of <br /> F $457.580- <br /> - requesting approval of a change order n a <br /> - Motor for the pump � sane as above req <br /> in the amount of $317'.00. <br /> n of these items unless their were <br /> Mr. Re stated there would be no cons derat�o vii ri r� <br /> presented with change, of <br /> orders that are on the minus side for the <br /> g <br /> 1 single phase* as previously stated. <br /> E11 i s stated he spoke with Mello <br /> and his credit will be $410. for single phase. <br /> 1' <br /> ` the items with one change order issued <br /> Ellis stated he would suggest accepting <br /> for the compressor motor� pump motor an <br /> d the credit for the single phase. It <br /> would be a net add of $364. <br />
The URL can be used to link to this page
Your browser does not support the video tag.