My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:13 PM
Creation date
2/22/2018 1:58:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Building Co3nrni ttee <br /> �1e <br /> eti g of December 17 x 1984 <br /> Page 5. <br /> -scussion, the committee agreedGed the amount requested for the <br /> rental of <br /> After di substantial and requested Ellis to haveTriple A provide <br /> the gas generator was <br /> an invoice. he feel s <br /> he incoming road is sor�ethi ng <br /> ted the Item for hardener on t s ror�i sed to him. <br /> El 1 u s stated <br /> should �e cancelled but Aaron Cohen stated $200. wa <br /> some asphalt, at their requests <br /> • aced he final to go hack and cut i ns i de which will <br /> Ernie �1�rg�l�� stated and also, moved the compressor <br /> which ch w�11 cost Triple A $200. <br /> cost $75;00. <br /> writing g and asked that any future <br /> nested Mr.. Vi rgi 1 i o put this�s �n with the oommi ttee's <br /> re F e reg do work for the contractor he answered <br /> requests for him to <br /> knowledge and approval . <br /> his superintendent put in writ,ng <br /> Verne Polka suggested ted that the contractor or � <br /> a <br /> the work requested and the amount they intend to pay. <br /> f the s�to work, Moving ng the com� <br /> ed cutting the asphalt was part or. rg�l agreed to <br /> It was afire -tern 'and internal to Triple A. <br /> pressor was a separate I tar Si n i t <br /> a bill and have the contras g <br /> make outetc <br /> loam am a 1�i ed where required) <br /> • paving w'11 have to he cut, pp to e cut e <br /> E11 -s advised the p g s ri n He suggested all areas <br /> s art of the s�to work n the ' .g' he done in the spring. <br /> a p work <br /> completed <br /> eted at one time and the rema�n ng <br /> su es ted the cement wa11� he cut out and instal 1 ed as soon as <br /> John t4yllie fig Tactor is off the doh. <br /> POS s it e, efo re the contractor p to February 17 to <br /> schedule, the contractor has up January 20 <br /> Referring to the new should be approimatel y <br /> h a i nti ng. Ell 's stated occupancy <br /> s finis p <br /> to <br /> 27. <br /> unch 1i�st and Ellis stated when <br /> sti oned moving in before the p noted. <br /> f not <br /> John l yl l e que ver s i ngle e mark or discrepancy is <br /> the punch list is done, every s onsi bl e. <br /> list, <br /> s tr. V i rg i l 'o would he re p <br /> j'. <br /> on the , <br /> i <br /> Sur mati on of the Requi si ti on: $3196,11 <br /> Change order <br /> .� Same as last month -� <br /> Contract Sum to Date 404,352.11 <br /> Gate 3 23,o18.69 <br /> j' <br /> Complete & Stored to 165150-00 <br /> Retai nage <br /> i Retainage na e 306,868,69 <br /> ,- Total Earned less g ❑ <br /> 1: 92�7 55.69 <br /> This regu i S i ti on <br /> would d hate a new requisition typed tomorrow and get approval <br /> � El l i s stated he w <br /> from Aaron Cohen <br /> � as tonight could he deducted <br /> e i nvo i Des Ernie Vi r~g I l o h fie wI thhel d <br /> Ell 's S was askedi If ,the r thi n that could possible <br /> re u 1 s*tion. He stated eve y q <br /> rn this q applied against site work not <br /> fro e and tyre invoices�ccs w�11 he pp <br /> for site work was don that from retainage <br /> requisitioned for and anything above <br />
The URL can be used to link to this page
Your browser does not support the video tag.