My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/30/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
1/30/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:06:52 PM
Creation date
2/22/2018 2:02:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/30/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC WORKS BUILDING COMMITTEE <br /> MEETING of JANUARY 30, 1985 <br /> o <br /> r�embers <br /> Public s o rks Bu i 1 d i n g Committee were <br /> following awe� f the Mashpee �� C. Re� dohn Wyllie, <br /> The 9 held at Ma�shpee Town Hall : Samuel <br /> resent far the rneeting � <br /> present <br /> Anthony F'orentini and Ernest Virgilio. <br /> � <br /> ccs Aaron Cohen and dace Cartier. <br /> Also present were E11 `s Laic� <br /> The meeting eti was called to order at 7:00 p!m• <br /> with chars <br /> E111"s presented the committee w� 9e orders to he reviewed* <br /> Order #6: Entrance Mats $300,00 -c redit to owner` per specificati <br /> Change Oons <br /> �` <br /> Change Order #7. <br /> Rental of Gas Generator: $879.37. <br /> • the amount for the actual rental <br /> After r discussion the comms ttee agreed to pay t was waived b Mr. <br /> for of $831 .00. The balance far 1nteresof the gas generaCohen and the $831 .00 accepted4 <br /> change orders #6 and P. Unanimous,* <br /> VOTE, Moved and seconded to approve 9 <br /> d food Beans <br /> -. Credit due owner of $425-00 offered <br /> Change order #8: Laminate by Triple A. <br /> • Chester Brown at a previous vneeti ng <br /> discussion of the figures presented by e from whom he <br /> After d sc r tten qlo tate on from the people <br /> Aaron Cohen agreed to obtain n a w committee his prices included <br /> . his orig+ <br /> nal pr i-ce, He informed the <br /> Sol c ted h 9 Brawn 4 s did not <br /> drilling of the beams and Mr. <br /> reed Change Order #8 <br /> could not he r <br /> enol ved at this meeting. <br /> It was ag <br /> of fence osts , E1 l Is <br /> a change order for the removal p , <br /> Concerning request for 9 h the town. Mr.* Re poi nted out <br /> e removed Masa <br /> ch and .Y r labor <br /> stated 50% were had sacred a 'considerable derabl e amount fo <br /> that the posts the town removed n u with the cost shared <br /> t p reed a change order wi 11 be draw p <br /> It was agreed charges, and Tr i p1 e A (248,06) <br /> F <br /> by <br /> the ($250.00) <br /> ressor <br /> e order far rewind of the 'p <br /> l l i s referred to a request for a change <br /> rev <br /> IOUs change order. <br /> E Cohen this was included n a p <br /> motor and advised Aaron <br /> Cohen agreed to rescind his request <br /> F <br /> r ar�el s at the front stairway # o <br /> st for change order to frame fou p ass. This item <br /> Request ad completed. ala price for gl <br /> receive gl ass word already <br /> would he change order #10 in the amount of $277.964 <br /> framing for future glass in the <br /> Moved and seconded to approve the g <br /> VOTE: Ma mount of $277.966#2 staliravell in the a - <br /> is <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.