Laserfiche WebLink
P ubl i c' Works Building Committee <br /> tin of January1985 <br /> Mee , <br /> Page . . <br /> Chanle Orders - Continued: <br /> box frame and cricket � $789.55- <br /> Request <br /> for change order for special <br /> - which were not followed and it <br /> ` ised he had made two recommendations does not constitute <br /> Ellis adv selected by the HVAC man and <br /> was completed i n the manner` <br /> an extras <br /> alb-�bl�{deY'�. hid a ��r7o� �f time <br /> ` stated the HVAC man, as a filed s . ee should not <br /> Bohn Wyllie st receive an addendum. The coy tt <br /> question the architect and! ^ that no shop drawings had <br /> to � his overs i gl�t. It was Hated t <br /> be asked to pay for <br /> been presented. <br /> . r could have recommended an alternate <br /> Cohen stated, �n his o��n�on, Maurer � further stated that i n <br /> Aaron � suggested a flexible vent. He fur <br /> method and could have sung been more cooperation from the <br /> • to the committee there should have " He advised hi� course <br /> fairness <br /> should d net have come up at the last minute, <br /> sub and this • 'led sub-bidder as he initiated <br /> • be to charge this against the <br /> filed <br /> of action will 1 A. <br /> a problem which was not the doing of Triple . <br /> concerning two iters submitted prev- <br /> ad two statements of January 14 c by Mas as ch i . <br /> X11 s re regarding additional site work <br /> V ousl y on october 1 and <br /> + �nter`est �- $3876"2undeY' bldg <br /> 10/1/84. $3755-00 $3231 -00 - Gravel & f 111, <br /> $3130-00 + `�nterest <br /> ed reviously to absorb the Dost <br /> { pointed out that Aaron Cohen had afire � otter to ,that effect. <br /> �l 1�s p the bu�1 d�ng and there was a 1 <br /> for ravel and fill under s were rude in the trailer with <br /> he stated calculationconcerning the $3B76.25, roximatel 3000 yards less than <br /> sobs present which showed there were a plans. <br /> Masa to build n accordance with the <br /> originally, if able i <br /> his firm for additional <br /> aschi has made written demands to <br /> Aaron Cohen stated Mas committee for review and representing <br /> funds <br /> and he is passing them on to the action. He advised that <br /> • s t he hopes <br /> they will take po s t ve ex l a i ni ng <br /> Masascb� s interest, explanatory letter from the architect � <br /> he i s regues t�ng s an and he will proceed from <br /> whatroved <br /> r <br /> why not the change order s not approved thesub-contractortook <br /> why , o h e stated i t i s his feeling th <br /> e} In looking back, his costs, as well as the <br /> there. and tried to accelerate h <br /> advantage of the situation <br /> fact he did not man the job. <br /> - Aaron Cohen was present at a comm�t ee <br /> ' ted out that on September �� Aar orb the cost of the <br /> Mr. e pointed s stated that Tri p1 a would abs <br /> meeting at which time it war ed change orders were received on <br /> d r the building. then the propos g <br /> fill un e raising the excessively excavated <br /> there was an amount of $3130. far ray sand it was under'- <br /> October e agreed they would not consider <br /> building whi ch the comma tte g <br /> stood Aare n Cohen agreeds <br /> td be a wipe-out, no extras and no <br /> Mr. Cohen stated his Intent was that it <br /> wool <br /> credits. <br /> 1. <br /> 1 <br /> • <br /> i <br />