Laserfiche WebLink
L ' <br /> public �a res. Building <br /> Corm 1 <br /> tt�'-- <br /> ieeti � of January 3C1985 <br /> page 3• <br /> Orders - Continued: as i t was previously <br /> Chan e the two proposalsthe con <br /> reed not to approve oundati on walls and <br /> The c0mmf ttee agreed <br /> be put w1 thin the f fill and that the <br /> the extra wool d p re was no excess f <br /> agreed orb this and that the <br /> tractor would ahs bs less. <br /> contends that I t i <br /> arch teat <br /> s �r. Cohen requested. <br /> Ellis agreed to write a letter a <br /> ass in the <br /> larger er panels of ��� <br /> s man recommends the g � ,�k� or 1 glass ass due <br /> advised the glass be changed to / i d{ <br /> Ellis ' i � �}`L should oul d be anti <br /> �i��t�L.4� <br /> t were specified i ed / an extra and should <br /> entry <br /> that anon. This would he <br /> to the size and 1 o c m cost woul d he <br /> ted carpentry would <br /> be waived and the maImu <br /> Aaron Cohen stated <br /> $150,00. der #11 i n the amount <br /> proposed estimated change or <br /> mm i tte e agreed to a prop $�� to 3/4 or 11' s four pieces- <br /> The co a the glass ass from <br /> of $150.00 to change i n American can En- <br /> • a change order concerning , ces on <br /> En- <br /> advised sed there will �e ted there were 1 nstan <br /> Mr. Cohen was �` Anthony Fjorenti ni stated �n disputed. He <br /> ` ear i ng and <br /> testing t�ng� 10/29/84 that were be� � of the <br /> ��n � 1��� 1�� and , <br /> 1 1 g/ and agreed to send copy es <br /> 10/1 not for corp ng a r #1 <br /> these bills l i s were would <br /> be change order <br /> advised letter to Ellis <br /> s: 1'h�s w <br /> bills wit h a l e arts storage <br /> i n ca11 ed for �n the p to <br /> • at there was no cei 1 1 e across the ceiling <br /> X11 i s advi sed that has put Rom cab i s wi 11 have <br /> ' aces S . Th <br /> however the el ectr c an i n open space <br /> room which should not he exposed <br /> a junction box <br /> to be cover • � � than <br /> s <br /> tical cell "ng wl 11 V <br /> suspended acou ould not exceed $300. <br /> Aaron Cohen s toted a p <br /> A �e estimated the cost w onform to the <br /> to ed and fin shed. mei exposed does not c He <br /> drywall p ceiling with the Ro mit being obta�nedi <br /> He adv'sed the open regent an ocaupancJ per <br /> al code and would p order 13. <br /> electrical `de figures for a -change <br /> agreed to pro vel o stating <br /> g <br /> e he has <br /> a letter from h is <br /> advised the comm tte i c i an which has voided <br /> Mr, Cohen further with by another el ectr <br /> erect w o explain the telephone <br /> `s work r has been tamp e a 1 etter to del 1 a � non was called <br /> h� Ellis agreed to writ that *s the reason boa <br /> } guarantee with the owner and t *cal f <br /> an w111n1 y deal do with the electrical <br /> company , ria t have anything to <br /> in and �t d�d <br /> in the wall and tie <br /> • ctri ci an put a receptac a as been corrected. <br /> r explained a�ned the el a e it and the err❑r h <br /> Jack Carte p e was told to remove <br /> j <br /> into Mel l o s panel . 1 s but ball- <br /> s. <br /> drawings show handra� This <br /> t hall approved shop area of the glass. <br /> l l i s advised the fron of shown in the front <br /> � � the handrail are no <br /> hal 1 asters are Heade • <br /> uster~s bel approximately 1 <br /> cr'1 t i cal area and pp <br /> is <br /> is a <br /> l <br />