Laserfiche WebLink
f <br /> J, <br /> f <br /> PUBLIC ORS BUILDING COM�IITT <br /> UAY 8', 1 g8 fTr�Y <br /> MEETING of FEB <br /> • Bu i 1 d i ng Committee were present <br /> tubers ��` the Mas tepee Public�� Works Fi orenti ni <br /> The following me 'own Hall : Samuel �. Re, Anthony <br /> for the meeting held at the,Mashpee <br /> John Wyllie and Ernest Virgil lo. <br /> ent were El 1 i s Laycock, Jack Cartier,, <br /> Leo sweeney q Arthur Jo i a and <br /> Also Pres <br /> Monica McNally. <br /> The meeting <br /> was called to order at .00 p.m. <br /> ater at the building was potable. <br /> discussion concerns ng whether thew don Noonday. <br /> There was rt on the sample taken was expecte <br /> Jack Cartier stated a repo <br /> ' concerning the bills received <br /> advised he call ed the Utilities responsible until <br /> Ernest Virgilio o inform ed t bem the town would not be <br /> for the new building and i of i tten in this regard, <br /> ' the building. Letters were also written <br /> moved in to <br /> • r the second floor concrete had <br /> Anthony Fro <br /> ren t i n i advised the 56 day test fo <br /> come in at1 1 b. test. <br /> ' e #2527 f roan Atlantic Design for <br /> • Moved and seconded to approve Invoice c Unanimous vote. <br /> voTE. <br /> Step g in the amount of $445-00. <br /> would complete ete the rough grading <br /> ' advised the committee that Bonito to w p el ectr1 cal <br /> Jack carter adv also advised the plumbing and <br /> s soon as the weather perms is. e h his ins ection. The <br /> a he FireChief was sats sf�ed w�t inspection. <br /> have signed off and the in and the problem with head room <br /> hal 1 ust <br /> ers in the star rwe11 have been put <br /> back stair area has been resolved <br /> i t <br /> n the ba <br /> r 29th and the committee <br /> • d the da <br /> ate on the contract s Jar�uao1�e11, <br /> The Chairman state which wi 11 be g even to Aaron <br /> ' discus sing a letter to the architect of the building caused <br /> is <br /> i n the contours which i�nvol ved the move n the contract <br /> The changes d a two week extension woul d bring <br /> h the owner an <br /> a two week del ay � � � 1 i n that i f the contractor has a - <br /> to February 1 f I t s the comm'ttee s f ee ,g before any penalties <br /> could be to substantial cor�pl eta on d the <br /> equate manpower the fob tool room outside painting an <br /> ed excluding the ceiling in the d walls and the <br /> are i nvol v s rude to the concrete spattered <br /> hgrading,. Reference wa <br /> rdelve tile. <br /> floor unable to re <br /> . painted and accepted by the painting con <br /> Jack Cartier stated the was 1 s are p <br /> - ors are being scraped and will <br /> tractor. <br /> The <br /> o b i s go cleaned u p and the fl o <br /> s be ready for tile tomorrow* <br /> o telephone systems as of Thu rs- <br /> � advised he wi 11 be paying for tw p <br /> Mr. Virgilio stated Triple A should not <br /> the delay �n occupancy. dock Cartier <br /> day due to d until the town takes over the <br /> telephone system to be installed� <br /> allow the p <br /> I <br /> building. <br /> noted the telephone system had been ordered in consideration of the <br /> I t was n coni ttee by the superintendent, <br /> g caMn 1 etlon date given to the <br /> January P ,. <br />