My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/8/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
2/8/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:11:52 PM
Creation date
2/22/2018 2:03:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/08/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Building Committee <br /> Meeting of February 8, 1985 <br /> Page 2. <br /> removed by a Mr. Sinclair who <br /> ' si on of the lift and the darts r e building would <br /> There ways discussion ' Triple e A. <br /> It was agreed th <br /> not to have been pard b <br /> claims e � �ft was not o�erati anal . <br /> not be acceptable if th <br /> ' f the theft. He spoke with <br /> e police ce have been note f�ed � � er stated he <br /> Mr. Cartier stated th � n has been paid, <br /> �e forth <br /> Cohen and to his knowledge the Ana ants because he had not <br /> Aaron o admitted h e had removed the � <br /> Mr si ncl ai r� who a 'cb he would be there the <br /> called M ,fit w�11 be a problem to the � <br /> aid, but stated i i ttee was i ref armed the lift was <br /> been p 1 ed to return them. 1`he comm <br /> nest day when called a <br /> operational at this s time. <br /> been pal �n the requisition <br /> out that the contractor had p <br /> Bohn Wyllie poi rated 4000, for the s equi ent. <br /> of December 1 <br /> 3 1984, $3750. of the <br /> • he wi1� ma a up a preliminary <br /> the Works inform <br /> The Clerk o f ed the committee ttee <br /> room b room.. <br /> punch list starting Monday, r y <br /> $62-95 each� wi th a doss 1 bl e <br /> F obtain lockers for <br /> Mr. Virgilio ad r1 sed he can <br /> 0% discount. <br /> 'r ilio to have a purchase <br /> seconded to authorize Ernest �� 9 * each, <br /> VOTE- Moved and sea a mai arum pry ce of $62095 <br /> order issued for i 1 ockers at Unanimous Votes. <br /> e f the painting <br /> • <br /> tractor asked what percentag o <br /> r Jo"a a, the pal rrt�nq contract general contractor to date <br /> Arth u d b the committee to the gen credit is <br /> contract had been poi If a <br /> cans i s is of the total job. <br /> pe the exterior a money be rets ned by the <br /> and whatpain ng, he asked that the �#e stated <br /> to be given for future p e i s not a filed sub-bidder. <br /> owner, not <br /> the contractorf He advised o finish the jobs <br /> ;. he 1 s concerned there will 11 oat be sufficient money t <br /> con56% <br /> tractor ' $10,1240 of 18,coo for <br /> tractor has been pa d <br /> it was noted the general 21 . <br /> com pl et1 o n <br /> as of requistlon at Januar <br /> . discussion of the painting <br /> • Aaron Cohen should be involve �n any Mr. do i a agreed. <br /> E11 1 s stated d be corns i dared careful 1 Y. <br /> contract tract ar�d this item shoal <br /> • he cosi ttee was advised a <br /> en ted to the committee. T •on at the <br /> Change-orders -were Pres deer due to a tall correct1 <br /> ,. new sheet was required for change or <br /> bottom* of <br /> determined a <br /> difference <br /> ecl�3 n � e .n: <br /> ` El 1 i s s t after er c 9 <br /> e Order # stated a the town. , e advi sed _ <br /> 1: <br /> j. <br /> chang be r a credit to <br /> ted Wood <br /> '�� ads � <br /> a ami <br /> $586.50 on t F re <br /> he f`� u ; ..,, <br /> ` c�he�l has �o t agreed to t � - - <br /> i, 4ar''`o the nett meeting <br /> r. <br /> }serpent until <br /> atter' under adv� • <br /> i t was agreed to take the m <br /> l <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.