Laserfiche WebLink
Publ iI c Works Building Committee <br /> Meeting of March 4, 1985 <br /> Page 2. <br /> CHANGE ORDERS: <br /> • Moved and seconded to approve change order #5 - $300. credit to <br /> v�T�; <br /> owner for foot scrapers Unanimous. <br /> Moved and seconded to approve change order #7 $831 . add to the <br /> VOTE: <br /> contract for the rental of gas generator. Unanimous <br /> VOTE: <br /> Moved and seconded to approve change order #8 $586,50 credit to <br /> owner for substitution for Laminated Wood Beams. Unanimous <br /> d and seconded to approve change order #9 - $25U. add to contract <br /> vUT Ei, Move pp <br /> to replace fence posts removed. ($498, to tat cost split with Triple A) <br /> Unanimous <br /> d and seconded to approve change order #10 - $277.96 add to con- <br /> tract to reframe for glass panels. <br /> VOTE: Mone pp Unanimous. <br /> VOTE: Moved and seconded to approve change order #11 - $150, add to con- <br /> tract to change the size of insulated glass. Unanimous <br /> VOTE: Moved and seconded to approve change order #12 - $386. credit to <br /> . <br /> owner for charges incurred for concrete testing personnel on site <br /> with no action taken. Unanimous. <br /> VOTE-11 <br /> Moved and seconded to approve change order #13 $519, add to con- <br /> tract ct for ceiling in tool room, Unanimous <br /> 1lUTE,• Moved and seconded to approve change order #14 - $580. add to con- <br /> tract for installation of bal l usters. Unanimous, <br /> VOTE: <br /> Loved and seconded to approve change order #15 - $282* add to con- <br /> tract for 4 panels of glass at base of stairwayp Unanimous. <br /> Moved and seconded to approve change <br /> v�T� order #16 - $110. add to con- <br /> tract to install electric door strike at the clerical reception area Unanimous. <br /> VOTE: Moved and seconded to approve change order #17 - $962. add to con- <br /> . <br /> tract for 5 thresholds at repair garage doors to office side area <br /> (Required b Selectman Hanson and Building Inspector) Unanimous. <br /> Ells advise <br /> • d there will be three more change orders to be considered when <br /> i s resented. a credit of approimatel, $50- <br /> #18,, .the final reguisiton p for o1 urethane �n <br /> $100 to the owner for the substitution of polystyrene p � <br /> the foundation; #19 a credit to owner of $1100. for accepting 2500 1b. con- <br /> crete in place ace of 3000 1 b; #20 will be an add for rough plumbing in the <br /> southwest corner of the lunchroom area. <br /> After discussion the committee agreed to take care of the item in # U sep- <br /> arately <br /> eF- <br /> arately w <br /> i th a direct purchase order. Ellis agreed to obtain an estimate r <br />