My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/13/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
3/13/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:12:04 PM
Creation date
2/22/2018 2:04:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/13/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pUBL Ic WORKS BUILDING coMM ITTEE <br /> MEETING OF MARCH 13, 1985 <br /> orks Building d i ng cor�r�i ttee were present <br /> f o1 lowi n r�embers of the Public Wl l i� Anthony Fior- <br /> The 9 the Mashpee Town Hall : John Wy <br /> for the meeting h e1 d a t p <br /> ere Ernest ilio and El l i s <br /> entin� and Joseph DiMaggio. Also present <br /> Laycock. <br /> Them <br /> meeting was called to order at 7:00 p.m, <br /> plaque for the bu i l d i ng. The secretary was <br /> There was discussion of the pl�►� � those named on the <br /> • e a draft cop�r and circulate i t t seal <br /> instructed to tip recommended a casting of the Town <br /> l a ue for their approval . � Ellis i cation plaque inside <br /> R the building with a small ded i <br /> far the exterior oft <br /> the entrance. He agreed to obtain�n a cost for each item discussed. <br /> Concerning the <br /> leaks at the Public <br /> ublic Works <br /> ;Building , c <br /> opi es of letters <br /> s f <br /> ro <br /> m <br /> Ernest Virgilio to Ellis Laycock and Ellis 's response to baron Cohen of <br /> hen hadpromised on <br /> toda `s date were distributed. Ellis stated Aaron co <br /> the building while the water was <br /> Monday to have the superintendent in <br /> Ell ' <br /> i s called Aaron again this morn. <br /> n i n* When he did not arrive, E r tomorrow at <br /> leaking t wi th the caulking sub-contractor <br /> i ng and Aaron i s to meet he windows was <br /> • o a.m, Ellis advised most of the caulking around tcaulking i s fret <br /> • weather and d Edi not bond and a lot o <br /> done i n too cold filed sub-�bi dder, has been re- <br /> to be done. The caul k ng contractor a have seven wor�kig dais <br /> 6. <br /> n <br /> urn and complete th e i r work. They d <br /> quested to ret 'r work before they can be terminateIr <br /> to 0 on site and complete they <br /> 9 <br /> . d dead bolts were not i n� <br /> committee was advised sed that the hardware`ars have to be re- <br /> The c was blown off. This door w�11 <br /> stalled on the door that <br /> placed. <br /> • and duct man spent Wednesday at the <br /> Ernest Virgil1 o advised the plumber <br /> as main is surging and the gas company <br /> building. It was found that theg but today is recurring <br /> Thi's was corrected when the roan loft <br /> was called. Th 'ed t <br /> and the as company has been note f <br /> - 9 <br /> fan n the garage are not <br /> John Wyllie e advised Ellis the 1 ouvers on the E11 is further <br /> E11 i s stated this i s o punch nch 1 s t item. ht <br /> y closing properly. furnace have collars that are not ti <br /> stated the flues that go from the statement that the <br /> Maurer has been advised. Concernng a <br /> fitting and adjustment. <br /> metal front door is sprung, Ell 's stated this i s a n <br /> F ommi ttee would like to have change orders <br /> Mr. Wyllie advised Ellis the c <br /> ocessed immediately a to1 <br /> with a credit to the owner pr �y <br /> 1� <br /> 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.