Laserfiche WebLink
Public Works Building committee <br /> Meeting of March 13, 1 985 <br /> Page 2. <br /> ifigure,u re Earned less retainage.) is $368,516.11 <br /> It was noted the Paid to date g � held until completion <br /> contract amount of $393,116.69 total t $1g,395.5on a coi period be- <br /> ofthen final requ�s i t�on �s �ssued, the �� day <br /> of the punch list, � vouchers aid and not paid. <br /> iris wherein Triple A comes through with all p � <br /> tractor has been paid an , <br /> When satisfied every subcontractor d a release is receivewi <br /> d of 75 da s he i s entitled to receive the 5� withheld provided <br /> ded <br /> at the en y u grantee on the entire building i� <br /> he has completed the punch list. The q � ears <br /> he flat roof for 10 years, the shingled roof for � <br /> for one year, t ime. If he does not perform <br /> and other items for different lengths of t <br /> on all the guarantee items , his bond can be called. <br /> •Mr. vi rgi l l'o stated a letter 'I's bei ng sent to the committee stating that <br /> b the contractor, <br /> excavation for the salt shed is not completed ,� <br /> �f the The state <br /> e taken.t He has contracted to pave on April 5. <br /> steps must b shed. If action is taken at <br /> will mage in on April l to build the salt d <br /> ` on March ��� i f there i s good weather �t wool <br /> the next comms ttee meets rig he work. Th i s rust be <br /> allow 5-7 working days for the town to complete t <br /> completed or the grant will be lost. <br /> to bring this matter up with Aaron Cohen when <br /> Ellis advised Mr. Virgiliog 1 ist iter. <br /> he is <br /> at the building in the morning. it is a punch <br /> list <br /> to write a letter to Aaron Cohen to put the matter <br /> �lr.. Wyllie asked Ellis <br /> on record. If the work is not completed by Triple A, the town will have <br /> to contract to have i t done and back-charge Triple A. <br /> • Cohen has agreed that he will do the work. The con- <br /> tractor <br /> Ellis stated Aaron .g men t with him to go back <br /> tractor who is removing the fill has an agree <br /> 60 feet and a certain width for this purpose. <br /> was read which requests work beaches in the <br /> A letter from Mr. Virgilio <br /> garage and shelving in the parts room, Plywood bins for the sign room <br /> a total of $1780,00, mater�al and 1abor. These iteas <br /> and garage, forunterto s. <br /> are more urgently needed than lockers or co p <br /> s c i nd prior approval for lockers in the <br /> VOTE: <br /> Moved and seconded to re P � f $1020. dnanin�ous <br /> f . <br /> amount o <br /> and countertops n the amount o <br /> p <br /> meat for plywood bins in the sign <br /> VOTE: Moved and seconded to approve pay d l ar e <br /> tool bins i n the garage small workbench an g <br /> room, plywood d s het v i n i n the parts room, Material <br /> workbench in the garage an 9 Unanimous. <br /> and labor <br /> to cost $1780. total . <br /> do <br /> ' d to send a memo to Joseph Murphy inform*ing <br /> The secretary was 1 nstruc e <br /> hire of these votes. <br /> j <br />