Laserfiche WebLink
PUBLIC WORKS BUILDING COMMITTEE <br /> MEETING OF MARCH 20, 1985 <br /> f he Mashpee Public l i c Works Building Committee <br /> The following members � tt p Town Hall : Anthony <br /> resent for the meeting held at*Ma�9�o.the Mashpee <br /> were p 1 l�� and Joseh DI <br /> Fi orenti ni , John Wyllie p <br /> The meeting was called to order at 7:00 p.m <br /> • it was agreed any members available <br /> Concerning ce, <br /> for h i s recommendations. <br /> w*11 go <br /> to Boston and discuss It with the supplier <br /> • <br /> Mr. DIMagg i a advised Scannell Well Drilling would be willing to do a test <br /> � water ata max- <br /> I. . The will sink a well and adjust for goo w <br /> well dry nsul t the hoard of Health before pro <br /> ,mum cost of $500. He agreed to co <br /> ceeding. <br /> d to approve funds for a test well drilling <br /> VOTE: Moved and seconded pP <br /> not to exceed $500. Unanimous . <br /> send a letter tte r to Joseph ph Mu r'ph�Y requesting <br /> The secretary was �r�structed to for the s urpose. <br /> a purchase <br /> order be initiated to Scannell Well Dri l l i n� p <br /> water filter l ter system and Mr. Qi Maggio stated a <br /> There was d•�scuss�on of a w put down, He <br /> ter system tem may not be necessary after the test well is p <br /> f l o test the water quality and will notify <br /> stated he wi 11 be on the site t i l ter is required, <br /> the hoard <br /> of Health to collect a test $ampl e t If a f <br /> he recommended the committee contact Aetna Engineering of Hanover, Mass <br /> as read concerning a back chane to Triple <br /> A Memo from Ernest 1!I r l �o w m Maurer for warp comp_ <br /> h a bi 1 l attached i n the amount of $349. from <br /> A3, <br /> with hole on the Saturday and Sunday when the town <br /> l eted on the gas trap and man i al l this work was done <br /> d rtoo the Job i n order} to pave the site* I n t ' , <br /> un e <br /> ' d had to be corrected. Mr. v�r��1 �o stated e <br /> incorrectly by Tri pl e A an to Tri l e A by Maurer at <br /> der the impressio s i on this bill was directed p <br /> was un P He further stated he was *nstructed to <br /> the time the work was completed. advised i t was <br /> ' and when they got to the manhole, the plumber , <br /> do the ob wrongand had to be moved. This was <br /> put on incorrectly, the pipe was 'n <br /> at 5:00 p.m. on Friday. <br /> adv Berner t until the next meeting. <br /> 5- it was agreed to tape this matter under <br /> j d which requested permission to <br /> F A second memo f root Mr. Virgilio was rea <br /> $1000. for grad <br /> The estimated cost at _ <br /> the site for the salt shed. the banCi ng. <br /> prepare cl can i n u the yard. Th�s work to include <br /> ing and $200. for p <br /> l <br />