My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/20/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
3/20/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:12:14 PM
Creation date
2/22/2018 2:04:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/20/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Public Works Building Committee <br /> Meeting of March 20, 1985 <br /> Page 2. <br /> Mr. Virgilio advised the Board of Health has requested any dirt possible <br /> ' to the dura 11 not going back <br /> to be delivered . Bonito has stated he w�p <br /> to the site, <br /> ' cession * was agreed this is a punch list item and Aaron Cohen <br /> After des g <br /> reed to do tC i s work. However, n order that the state grant not <br /> has agreed be lost, it was agreed to approve funds for the preparation of the site <br /> for the salt shed in the required area of 50' X 80 t . <br /> It was noted Ellis Laycock was to have sent a letter to Aaron Cohen on <br /> March 13 stating this worm had to be completed or a back-charge would <br /> be involved. <br /> VOTE:E: Moved and seconded to approve funds , not to exceed $400. to <br /> allow for the excavation and preparation of the site for the <br /> salt shed. Unanimous. <br /> A requisition will be prepared by Mr. Virgilio. <br /> The committee ttee was advised the gas main that has been surging has to be <br /> replaced. A letter has been seat to Ellis Laycock advising the Gas <br /> Company <br /> will not relight the unit and will not install the part unless <br /> someone else wi 11 relight the unit. <br /> After discussion, it was agreed to authorize Ernest Virgilio,to arrange <br /> have the heating n contractor at the site when the gas man is there to <br /> to h g <br /> install the part to stop the surging; <br /> Mr. Vi rg <br /> ilio advised the fans in the bathroom do not work, the back door <br /> is not fixed, there are more leaks and there is no gauge on the air com- <br /> pressor.r. A letter has been sent to Ellis Laycock listing these problems, <br /> as we11 as <br /> others. He also advised the cove base is nearly complete and <br /> a firm <br /> has been hired to strip the floors , put on a sealer and three coats <br /> of wax, to be paid from his budget. <br /> The <br /> minutes of the meeting of March 13 were reviewed. The committee was <br /> advised <br /> Aaron Cohen ret with the sealant contractor and told him he had <br /> to do the caulking work, under protest, to repair the leaks . <br /> d the plumber has stated there i <br /> �t was note p s no Swedish copper used in <br /> the building* <br /> VOTE: Moved and seconded to accept the minutes of March 13 as written. <br /> r <br /> Meeting adjourned at 9:20 p.m. <br /> Res lectful l y. submitted, <br /> Diana M. Lund, Recor(ftng Secretary <br /> CB: Selectmen Verne Fool ka <br /> Joseph Murphy <br /> Aaron Cohen <br /> Ellis Laycock Committee <br />
The URL can be used to link to this page
Your browser does not support the video tag.