My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/10/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
4/10/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:12:38 PM
Creation date
2/22/2018 2:05:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/10/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> PUBLIC WORKS BUILDING COMMITTEE <br /> MEETING OF APRIL lo, 1985 <br /> Public� Words Building Committee were present <br /> The following members of the <br /> meeting held at Mashpee Town Hall : S. C. Re, <br /> AnthonyFiorentini , <br /> for the � ter sheets ands' Ernest vi rgi l i o. <br /> Chester Brown, Bohn Wyllie, Chester <br /> Ellis Laycock was also present <br /> The meeting was called to order at 7:00 p.m F <br /> • Carpet Barn had completed the job except for <br /> The committee was advised the p as agreed to request <br /> an`� office which was not contracted for. It w � . <br /> the Foreman the building for Ernest Virga 1 to to finish <br /> any Tema i ni ng cove base be 1 of t at <br /> the job. <br /> rove <br /> a payment to carpet Barn, Inc. in the <br /> VOTE: Moored and seconded to pp p � Unanimous Vote. <br /> . <br /> amount of $2798.000 <br /> Aaron Cohen today and he agreed a balance is <br /> Ellis advised he talked with <br /> due Bi`shop and he would contact him and report to Ellis tomorrow. Mr. Cohen <br /> 0 s not the correct one. He does not foresee <br /> stated he was not aware the pump Mr. Cohen further stated <br /> problems with the tradesmen except for Mas asch i . e <br /> any p with the sheet rock man who was paid twice <br /> Mr. �o�a of E f c.M.s� i s associated <br /> 'c a to $4000. to Mr. Uo i a. This was not done. <br /> and supposed to transm t the duel i <br /> Ellis stated he feels this will be worked out. <br /> per contract, E.c,C�.s. must finish the fob, <br /> Concerning the outside painting � <br /> if under protest. They are also obligated to return andrepaint where nec- <br /> essary. <br /> agreed with all the outstanding bills• He also <br /> E11 �s advised Aaron Cohen ogre • d will start final word <br /> has promised sed to tie up all loose ends <br /> this weep an <br /> April 18 through 22. <br /> *�'�'+at 1�J I e'�'y{�'� on May l will have to be postponed if this <br /> 1 r Re stated th e ded14 <br /> work i s not completed. <br /> The comi ttee was �n agreement ement that it would like Ellis to send a letter <br /> p <br /> first ste , should action be necessary t He agreed. <br /> to Triple A as the <br /> water analysis dated August 17 <br /> Chester Brawn stated a concern for the i bacteria, <br /> ' i ra Labs stats ng a vegetati ve odor due to iron consuming <br /> from 011' <br /> • not <br /> harmful . It wash s experience to have to <br /> which I's objectionable though location of the well <br /> abandon a well for this reason and suggested the final <br /> point nt be carefully considered, if this is a factor. <br /> 5raise the point if a location is found. He <br /> It was noted Bishop agreed to p satisfied with pay- <br /> reed to send a well dri l 1 er s report when he is also agreed fated he <br /> is waiting for a test report to <br /> vent by Trip <br /> 1 e A. Aaron Cohen s <br /> 1 state that the we 1 is satisfactory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.