My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/16/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
4/16/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:13:00 PM
Creation date
2/22/2018 2:15:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/16/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
=5 <br /> PUBLIC WORKS BUILDING COMMITTEE <br /> MEETING OF APRIL 16, 1985 <br /> rbers of the Public Works Building committee were present <br /> The following mei <br /> Samuel C. Re,, <br /> for the meeting' held at the Mashpee Publ �� forks Building: <br /> Jahn Wyllie, Anthony Fl Oren ti n i and Chester Brown. <br /> El 1 i s Laycock attended also. <br /> The meeting was called to order at 7:00 p.m. <br /> 4 f a fi gal cost forecast. change orders <br /> The camr�I ttee revs ewed caps es o re estimated amounts for <br /> 17 were actual amounts, and 19 we <br /> l throughn allowance of $3000 was estimated for <br /> a credit to owner of $1200, A <br /> correction oft � <br /> he water problem and $1200 estimated for a deli cats on <br /> plaque for the new building. <br /> it was noted Verne Polka w'11 not act on any change orders until 18 <br /> � <br /> and 19 are approved. <br /> ttee was advised Joseph D i Magg i o reportedScannell was u n s u aces s- <br /> The comm; d water at the test well and he would pro- <br /> fu <br /> f in an attempt to locate goo <br /> vice the committee with a full report, <br /> There was discussion of the methods available to filter or otherwise oro_ <br /> vide a better' quality drinking water. <br /> r i l l o from Triple e A to all sub-contractors <br /> A caps of a 1 etter dated April to be completed eted dura ng <br /> ' em all unfinished or red ected work is P job <br /> notifying th and a su erintendent will be on the <br /> the period of April 2 - April 27 p was circulated. <br /> • from 7:00 a.m. to 4+00 p.mt each da,y <br /> during ng the hours <br /> from Ell "s Laycock to Triple+A stating <br /> Also read was a copy of a letter f • 1 aok n to de- <br /> Also <br /> s not adhered to the comm 4 ttee wi 11 be g <br /> �f this schedule to finish the worm. <br /> fault the contract and as the bonding company <br /> contours of the .yard as drawn uP <br /> Ellis resented a drawing of the final c i s not done <br /> p ' showing the low and high areas. The paving <br /> by Jack Cartier sh g "n. This has been discussed <br /> n accordance with the pl arts but w l 1 dray <br /> with Ernest Ill rg l 10. <br /> 1where the asphalt should <br /> Ellis advised next week he w11 mark the area <br /> and haul it <br /> be cut and removed <br /> and Mr. Vi rg i 1 i o has agreed to remove i t <br /> away. <br /> base material left at the bu i 1 di ng. <br /> ave <br /> F <br /> it was noted there was no excess c <br /> i al to allow the re- <br /> Anthony Fiorentini agreed to obta'n suff'cient nater etc <br /> maining area to be comp1 d. <br /> is <br /> 3 l i nd for the window In the secretary's area* <br /> Where was discussion of a b <br /> ` and other data for the 9'3l' x61811 <br /> } <br /> Mrt Fi orenti n i agreed to obtain prices <br /> 'l final assessr ent of funds remaining* <br /> area, not to be considered unto <br /> 1' <br />
The URL can be used to link to this page
Your browser does not support the video tag.