Laserfiche WebLink
MASH.PCC PUBLIC WORKS 13 ILDING COMMITTEE <br /> MEETING of MAY 155 1985 <br /> The following members of the Public Works Building Committee were present <br /> for the meeting held at the Public Works Building: Samuel C,, Re, Chair- <br /> man , <br /> hair- <br /> man , John Wyllie, Chester Sheets,, Chester Brown and Anthony Ei orentin i . <br /> Also present were Ellis Laycock and Dennis Scannell . Aaron Cohen was on <br /> the premises with workmen tending to the punch list and was in attendance <br /> intermittently. <br /> The results of a water analysis for the test well put in by Mr. Scannell <br /> were presented to the co1iii-ni ttee. A comparison was made of the test well <br /> readings to the present well tests. <br /> Test Well Present Well <br /> Sodium 8.0 19 <br /> Iron 0,13 4.8 <br /> conductivi ty 108.0 41 0 <br /> Mr. Scannell advised he tried at 75' and 63' and the water was bright red. <br /> The good water was at 103 feet from the top of the finished grade, The ref- <br /> erence <br /> eference point i s 8-9 feet. He further stated the present well is at a depth <br /> of 80 feet. He agreed to leave the test well' in until the committee is sat- <br /> isfied. <br /> Aaron Cohen asked if the building committee was satisfied that the specs <br /> have been met and would accept the work by Pilgrim Pump. <br /> Ellis stated the work, to the extent done, i s acceptable but Bishop has not <br /> fulfilled his contract. To obtain acceptable water he had to go 110 feet <br /> below finished grade. He agreed to talk with Mr. Bishop with this report <br /> in hand. Mr. Bishop has previously agreed to provide good water, <br /> Answering Mr. Cohen, Mr. Scannell stated he felt it was the permanent pump <br /> that was in but there is no way of telling. The pump was set by L. Wile <br /> & Son of Plympton. <br /> Mr. Cohen stated he has received no close out documentation from any of the <br /> subs and, from experience, has found the only way to get this i s to withhold <br /> a suhstanti al amotint. He stated he requires "Ac built" drawings and a one <br /> ,year guarantee in writing and the manufacturer's warantee on the pump to <br /> close out the paper work for the well . <br /> It was noted the precast is in the site man' s contract. <br /> The committee concurred Mr. Bishop's work was not acceptable as substantially <br /> completed and that he must go deeper to find acceptable water. <br /> Aaron Cohen asked if Bishop does not return what the approximate charge would <br /> be for Scannell to cone back and adjust the well , give papers and sketches, <br />