Laserfiche WebLink
There will be a 2nd phase of the CS--10 study , and they will <br /> be drilling in the John' s Pond area next week* <br /> It ' s a drive-point method which is a non-intrusive procedure* <br /> They leave ,a somal l diameter wel l in place for sampling. They <br /> to be finished before the summer season. They are trying <br /> to determine if SD-5 is discharging into John' s Pond. <br /> John' s Pond' s influence on the downgrade side is significant <br /> down to bedrock; USGS helped them locate springs . <br /> Elias McQ. asked if- the removal of the hoorings are self-sealing. <br /> Bud Hoda stated yes { the sand collapses* <br /> They took under-water samples at that depth <br /> Jim Snyder will check to see if they .can pay for water samplin.Lj <br /> this summer (per Elias McQ* ' s request) . <br /> They did boorin s under Ashumet Pond last year and confirmed <br /> there were plumes . <br /> Nancy C. asked Jiro Snyder to check on the progress of the class <br /> action suit by residents affected by Ashumet water contamination. <br /> There will be a S & B Meeting on May- 6th, 6 : 30 p.m. to tie the <br /> two issues together, <br /> SHE NEXT MEETING of THIS COMMITTEE WILL BE HELD ON THURSDAY <br /> MAY 71 1998 at 8 : 30 A.Ma <br /> The meet inch adjourned at 9 : 30 a.m. <br /> Mary is horpef Co ittee secretary <br /> -3- <br />