Laserfiche WebLink
G <br /> e <br /> Nancy C. suggested a. dirt bike area, Greg T. cautioned about <br /> the liability 'issue i n an unsupervised area.. <br /> CRANBERRY BOG UPDATE: Bob S . stated that Nancy Ba lk i s has been <br /> assigned b AFCEE, Bob S. met with her and Bud Hoyda. They <br /> do not want to get 'into a long-term compensation situation. <br /> He suspects they see flaws with the berm and the impact on the <br /> fisheries ; they will deliver a Merao full of options at the end <br /> of August. Jacobs Engineering sub-contracted surveyors who <br /> were at the bog yesterday , Bob S . objected to that. He asked <br /> to be kept informed. Hopefully ,. there will be some direction <br /> by the end of this month. Bob S . will invite Nancy Ba.lki s to <br /> our next meeting on September 3rd. Greg T. suggested inviting <br /> DEP also. <br /> Nancy C. suggested the 'down give up the cranberry bog to stop <br /> the plume and not just divert with a berm. fancy C. stated <br /> we can apply for natural resource damage funds. <br /> Nancy C. distributed an update froirt Foothill Engineering <br /> Consultants. <br /> Greg. T. expressed concern with the way Brian Hand.y tried to <br /> stabilize the road. He would rather see crushed stone rather <br /> than whole stone. Bob S . asked Greg T, to send a MEMO on this <br /> so that he can take this up with Brian. <br /> NEW BUSINESS <br /> Greg T. stated it was announced at last night ' s meeting <br /> that everyone under- the IRP will have their own E-Mail address . <br /> There is $300 ,000 allocated to fines , $40 , 000 has been earmarked <br /> to U GS for their work , $100 ,000 to do a pump test on well #5 , <br /> and there is $160 ,000 remainIng remainingto be allocated. ichael <br /> Jasinsk.y (EPA) is taking recommendations for the remaining <br /> amount, Greg T. recommends closing LF-4 and doing testing. <br /> Elias M. thought $250 , 000 has already been allocated for closing <br /> LF-4s. <br /> Greg T. asked for some recommendations to submit to Michael <br /> J a s in sky to expend the $160 ,000 fine money, <br /> Nancy C, made a case for Back Road. Greg TO will write a <br /> Proposal for Back road. Elias M. stated to include the storm <br /> drainage system. <br /> Dave R. would like to submit the sentinel well that Woodard <br /> and. Curran proposed. This 'includes sample testing and well <br /> installation. Dave R. will have Bill Fisher contact Mi k chael <br /> Jasinsky and prepare a cost proposal* <br /> -2- <br />