Laserfiche WebLink
Conservation Coffmssion <br /> February 17, 1994 <br /> Page 8. <br /> Mr. DiGregorio advised the resource areas are coastal bank, Ls SF. ACOE and <br /> Chapter 91 require 25 feet off the sideline, They rust get a written affidavit <br /> from the adjacent property. ower that he does not object to less than 25 feet. <br /> By moving the structure ten feet to the west, they are getting quite a bit wider <br /> berth in Popponesset Creek. They are satisfying three levels of government in <br /> six different reviewing agencies. They rust stay 5 feet above the Mean High <br /> Water line for Chapter 91 requiring them to ramp up to the fixed pier. No <br /> destabilization of the bank will occur as a result of this limited activity. <br /> The salt marsh is shown in green on the plan. There is a small tongue of <br /> spartina. Fixed pier will cross about 28 feet of salt marsh; six pilings <br /> will be driven for a total. alteration of 4.68 s.f. Therewill be inch <br /> deck spacing. <br /> The resource ara .engendering the most concern has been land under the ocean <br /> and land containing shellfish. No eel grass beds were noted in the area. There <br /> is a .steep drop in bottom topography giving decent water depths at the float. <br /> The float will be 2 feet above the Mean Low Water mark to assure harvesting <br /> access. Total alteration in land containing shellfish will be 3.12 s.'f,, <br /> The Hendlers have a 17 foot Whaler; draft and bean measurements are included, <br /> inch draft with the prop lower. There will be 2.2 feet of water at dead low. <br /> No portion of the boat or float will be on the bottom. All segments of the pier <br /> will be built out from .the prior section and will be elevated 5 feet. The ramp <br /> and float will be stored away from the property in the off season. <br /> Mr. Homeyer asked where they planned to take the float to; are they going to <br /> take it to New Seabury Marina? Mr. DiGregorio stated that is yet to be determined. <br /> Mr. Homeyer stated that is -a shallow pitch, he would not want to see there dragging <br /> it across the salt marsh to store it in the front yard. <br /> Mr. DiGregorio stated winter storage will be off site. Mrs. Ferriday stated that <br /> will be conditioned, <br /> Mr. Johansen asked if this was in a restricted area? Mr. DiGregorio stated it <br /> does not appear to be; the restricted portion is on the west side of the island. <br /> Mr. Homeyer asked if that tip of Popponesset is in the -Zone? it is A-13. <br /> Concerning the arms to hold the float, Mr. DiGregorio stated it .is like a cradle <br /> situation. Floatation will be encapsulated. <br /> E <br /> Rick York stated therekar s ftshell lams ;in this location. The project meets <br /> the recommendation criteria and fits 'their guidelines. <br /> Public comment <br /> Bennett Gordon, Chairman of the Waterways, stated he would like to see contours <br /> as to the depths;. depth measurements are scattered and"era.tic. i. , <br /> Mr. DiGregorio orio asked if he had seen the revised plan? Dr. Gordon took F offense <br /> at thea providing a revised plan at the meeting when he had studied the prior <br /> plan that day and was unable to comment on the revised plan. Mr. DiGregorio <br /> stated he would have ample time to make comments at thegBoard of Appeals hearing <br /> in March. He will be forwarding plans to the Waterways Commission in the next <br /> few days. They anticipated his questions and got some additional depth soundings <br /> right around the float area. <br />