Laserfiche WebLink
PENINSULA COUNCIL,, Wading Place Road, continued from <br /> April 21, 1994. Michael. Grotzke presenting. He stated the <br /> final issue is the drainage basin off Fading Place load <br /> The Chairman stated the Commission was disappointed not to <br /> have received plans one woof prior to the meeting. <br /> Mr. Grotzke apologized and will try not to have it happen <br /> again. He has raised the elevation to allow siltation to <br /> settle off before going into the vernal pool area* <br /> Mr, Sherman asked if there was no objection to roving this 1 <br /> feet or so He asked if this will be done this fall? <br /> Mr. Grotzke stated it would. <br /> There was discussion of the pre-existing spillways. It was <br /> stated one currently not far enough away should be shown on <br /> the plan but Mr, Fitzsimmons felt they should all be on the <br /> plan. <br /> Mr. Grotzke stated the plan is based on existing conditions <br /> and is to 20 scale. <br /> Mr . Sherman asked if he went out and Measured distances t <br /> the one the Commission wants -moved? Mr, Grotzke did. He <br /> will go out with Mr. Grotzke and then have it put on paper; <br /> this could be done without a survey crew going out. It <br /> should be staked. <br /> It was agreed Mr-. Grotzke will meet with the Agent to locate <br /> then, a new plan will be provided and they will be staked in <br /> the field. Mr. Sherman will contact Greg Taylor for input. <br /> Mr. Hoeyer stated everything is done but the catch basin and <br /> the only discussion is about putting a Swale around the <br /> basin. They can retro-fit it for a gas and oil trap, <br /> Mrs. Ferriday added, with Maintenance. <br /> Mr. Sherman stated this can be closed at the next meeting. <br /> Public comments were requested: none. <br /> VOTE: Motion made and Seconded to close pending the on-site <br /> and receipt of a new plan. <br /> Mr. Ho .eyer abstained. <br /> Motion carried. <br /> CLOSED PENDING. <br /> 7:51 FRED LUCO I, 116 Poppone set Island Road, continued <br /> from 30 June 1994, Jeff Johnson and Mr. Luconi presenting <br /> i Issues raised: Twenty foot wide construction access road <br /> the contractor has determined work can be done from the <br /> location of the pier itself so the access has been <br />